Method Statement · Drainage Engineers
Method Statement for Drainage Engineers
A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For drainage engineer work, it has to cover confined space entry into manholes and chambers. It must include A numbered sequence from set-up to clean-down.
A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. Below: what a drainage engineer's Method Statement must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
A finished example
Example Method Statement from a similar trade (Air Conditioning Engineers)
We do not have a finished Method Statement for drainage engineers yet, so this one is from air conditioning engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.
The job it was written for: “Job: install, commission, service and maintain air conditioning and refrigeration systems in commercial and residential buildings, including pipework, electrical connections and refrigerant handling. Commercial unit, occupied during working hours, 2 operatives, 4 days. Main risks: Refrigerant gases: toxic, asphyxiation and pressure release risks; Electrical isolation: live conductors during installation and fault-finding; Working at height: rooftop and ceiling-void mounted units.”. Names and contact details are anonymised.
Method Statement, Example Air Conditioning Engineer Ltd
| Document | Method Statement |
| Company | Example Air Conditioning Engineer Ltd |
| Job Reference | Installation & Maintenance of AC Systems |
| Site | Unit 4, Example Trading Estate, Exeter EX2 8XX |
| Author | A. Supervisor |
| Date | 14 October 2026 |
| Version | V1.0 |
| Review Date | 14 October 2027 |
Company details
| Field | Detail |
|---|---|
| Company name | Example Air Conditioning Engineer Ltd |
| Address | to be confirmed |
| Registration number | to be confirmed |
| Phone | 01283 000000 |
| Named supervisor | A. Supervisor |
| Insurance valid until | to be confirmed |
Scope & description of works
This method statement details the safe working procedure for the installation, commissioning, servicing, and maintenance of air conditioning and refrigeration systems at a commercial property.
The work involves the installation of pipework, making electrical connections, and handling refrigerants. The site is an occupied commercial unit. The work is scheduled to last for 4 days and will be carried out by 2 operatives.
This document is to be read in conjunction with the relevant risk assessment. All operatives must be briefed on this method statement before work commences.
Site, access & logistics
Access and egress
Access to the work area will be via the main entrance to Unit 4. All operatives will sign in with the site manager daily. Emergency exit routes will be identified during the site induction and kept clear at all times.
Exclusion zones
- Work areas will be clearly demarcated using high-visibility barriers and warning signs, particularly during refrigerant handling and electrical testing.
- For any work at height, the area directly below will be cordoned off to prevent unauthorised access and protect personnel from falling objects.
- The supervisor will ensure all exclusion zones are maintained throughout the duration of the works.
Deliveries
All deliveries of plant, equipment, and materials will be coordinated with the site manager to minimise disruption. Materials will be stored in a designated, secure area, away from main access routes and fire exits.
Key principles / safe-work basis
Governing principles
- Electrical Safety: All electrical work will be carried out DEAD wherever possible. A formal safe isolation procedure, as required by the Electricity at Work Regulations 1989, will be followed before any work commences on electrical circuits. Live testing will only be performed where absolutely necessary, by a competent person using appropriate equipment and precautions.
- Refrigerant Handling: All work involving fluorinated greenhouse gases (F-gases) will be performed by F-Gas certified engineers in compliance with the Fluorinated Greenhouse Gases Regulations 2015. A leak check will be performed on completion of any work on a refrigerant circuit.
- Work at Height: All work at height will be planned and executed in accordance with the Work at Height Regulations 2005. The primary control will be the use of collective fall prevention equipment (e.g., mobile elevating work platforms or mobile access towers).
Competence
All work will be undertaken by competent and suitably qualified Air Conditioning Engineers. This includes holding a valid F-Gas certification and qualifications for electrical work (e.g., BS 7671 18th Edition). Evidence of competence will be available for inspection on site.
Sequence of operations
1. Site set-up and preparation
- Arrive at site, report to the client representative, and complete the site induction.
- Conduct a pre-work site survey to confirm the location of services (electrical, water) and identify any site-specific hazards.
- Transport all tools, equipment, and materials to the work area using appropriate manual handling techniques. Use trolleys for heavy items.
- Establish and signpost the designated work area, setting up barriers as required.
- Check that all power tools are in good condition and have been visually inspected before use.
- Ensure adequate lighting is available in the work area, particularly in ceiling voids.
- Check the fire extinguisher is of the correct type (CO2/Dry Powder), in date, and immediately available.
2. Electrical isolation and preparation
- Identify the correct circuit(s) for the air conditioning units at the distribution board.
- Isolate the power supply using a lock-off device and retain the key. Place a "Caution: Do Not Operate" tag on the isolator.
- Using a GS38-compliant voltage tester and proving unit, prove the tester is working.
- Prove the circuit is DEAD by testing between all conductors (phase to neutral, phase to earth, neutral to earth).
- Re-test the voltage tester on the proving unit to confirm it is still functioning correctly.
- Only once the circuit is proven dead can work on electrical components commence.
3. Installation of indoor and outdoor units
- Lift and position units using a two-person lift or mechanical aids where required, following manual handling risk assessment controls.
- Securely fix all mounting brackets to the building structure using the specified fixings.
- Mount the indoor and outdoor units onto the brackets, ensuring they are level and secure.
- For rooftop units, establish a safe working area using temporary edge protection or a designated exclusion zone at least 2 metres from any unprotected edge. Tools will be secured via lanyards.
4. Pipework and drainage installation
- Run copper pipework between indoor and outdoor units, ensuring it is correctly supported with clips at specified intervals.
- Brazing of copper pipework will be carried out using an oxy-acetylene set. A hot works permit must be obtained from the site manager. A fire watch will be maintained for 60 minutes after brazing is complete, and a fire extinguisher will be present at the point of work.
- Insulate all pipework as per manufacturer's specifications.
- Install condensate drain pipework with the correct fall to ensure proper drainage.
5. Refrigerant system pressure testing, evacuation, and charging
- Connect a pressure test rig with a calibrated gauge to the system.
- Pressurise the system with oxygen-free nitrogen (OFN) to the manufacturer's specified test pressure.
- Leave the system under pressure for the required duration to test for leaks. Monitor the gauge for any pressure drop.
- Once the system is confirmed to be leak-free, release the OFN to a safe area.
- Connect a vacuum pump and evacuate the system to remove all moisture and non-condensable gases, achieving the required vacuum level (microns).
- Charge the system with the correct type and weight of refrigerant as specified on the unit's data plate, using calibrated digital scales. Record the quantity added.
6. Final electrical connections and commissioning
- Make final electrical connections to the indoor and outdoor units.
- When all personnel are clear, the lock-off device can be removed by the person who fitted it, and the circuit can be re-energised.
- Power up the system and carry out commissioning checks as per the manufacturer's instructions. This includes checking voltages, running currents, and system operating pressures.
- Test all functions of the air conditioning system, including heating, cooling, and fan speeds.
7. Completion and handover
- Complete all required F-Gas and commissioning paperwork.
- Clean the work area, removing all waste materials, tools, and equipment. Dispose of waste in the designated site skips.
- Demonstrate the system's operation to the client and provide them with all relevant documentation.
- Sign out with the site manager and leave the site in a clean and safe condition.
Plant, equipment & materials
| Item | Safe use requirements | Completed, date & initials |
|---|---|---|
| Mobile Access Tower | Erected by a PASMA-trained operative. Inspected before first use and weekly thereafter. Scafftag system in use. | |
| Mobile Elevating Work Platform (MEWP) | Operated by an IPAF-trained operative. Pre-use checks completed and recorded. Harness with restraint lanyard worn in boom-type MEWPs. | |
| Ladders / Stepladders | For short-duration, low-risk work only. Inspected before use. Maintained with 3 points of contact. Not to be used as a work platform. | |
| 110V Power Tools (Drills, Grinders) | Visually inspected before use for damage. Used with RCD protection. | |
| Core Drill | Operated by a competent person. Water suppression used for dust control. Area below work to be cordoned off. | |
| Oxy-acetylene Brazing Set | Cylinders secured upright on a trolley. Flashback arrestors fitted. Hoses inspected for damage. | |
| Refrigerant Recovery Unit & Gauges | Calibrated and in good working order. Used only by F-Gas certified personnel. | |
| Vacuum Pump | Visually inspected. Cable in good condition. Positioned on a stable surface. |
Hazardous substances used
| Substance | Where used | Hazard | Controls | COSHH assessment ref. | Completed, date & initials |
|---|---|---|---|---|---|
| Refrigerant Gases (e.g. R32, R410A) | AC systems | High pressure, flammable (R32), asphyxiant, cold burns | Handled only by F-Gas certified engineers. Good ventilation. Safety glasses and gloves to be worn. No naked flames. | COSHH-1 (generate) | |
| Oxygen-Free Nitrogen (OFN) | Pressure testing | High pressure gas, asphyxiant | Secure cylinder on trolley. Use correct regulator. Good ventilation. | COSHH-2 (generate) | |
| Brazing Fumes | Brazing pipework | Inhalation of metal fumes | Hot works permit. Good natural or mechanical ventilation. RPE may be required. | COSHH-3 (generate) | |
| Fluxes and Solder | Brazing pipework | Skin/eye irritant, harmful if inhaled | Wear gloves and safety glasses. Avoid inhaling fumes. | COSHH-4 (generate) | |
| Coil Cleaner / Disinfectant | Servicing | Irritant to skin and eyes | Refer to SDS. Wear appropriate PPE (gloves, goggles). | COSHH-5 (generate) | |
| Silica Dust (from drilling masonry) | Fixing brackets | Lung disease (silicosis) | Use on-tool water suppression or dust extraction (M or H class). RPE (FFP3) to be worn. | COSHH-6 (generate) | |
| Asbestos Fibres | Building fabric (pre-2000) | Lung cancer, mesothelioma, asbestosis | ⛔ STOP, CONFIRM AT SITE SURVEY: Confirm presence/absence via asbestos register before drilling or disturbing any building fabric. If asbestos is suspected, stop all work and inform the supervisor. Only licensed contractors may work on or remove most forms of asbestos. | COSHH-7 (generate) |
Competence and training
| Role | Required competence (cards, tickets, training) | Evidence held |
|---|---|---|
| All operatives | CSCS card; site induction; manual handling training | to be confirmed by Example Air Conditioning Engineer Ltd |
| AC Engineers | F-Gas Category 1 certification (City & Guilds 2079 or equivalent) | to be confirmed by Example Air Conditioning Engineer Ltd |
| Operatives working at height | Working at height training; PASMA for mobile access towers; IPAF (3a or 3b) for MEWPs | to be confirmed by Example Air Conditioning Engineer Ltd |
| All operatives | Asbestos awareness (Category A) training, refreshed every 12 months | to be confirmed by Example Air Conditioning Engineer Ltd |
| Electricians | 18th Edition (BS 7671) qualification; ECS card; safe isolation training | to be confirmed by Example Air Conditioning Engineer Ltd |
| Named first aider (to be confirmed) | First Aid at Work (FAW) certificate, in date | to be confirmed by Example Air Conditioning Engineer Ltd |
Supervision: All work will be overseen by the named supervisor, A. Supervisor, who is responsible for ensuring this method statement is followed.
Key controls
This is a summary of controls identified in the risk assessment. The responsible person must confirm these controls are in place and effective before work starts.
| Hazard | Key control measures | Completed, date & initials |
|---|---|---|
| Working at Height | Use of MEWPs or mobile access towers as the primary means of access, erected and operated by trained personnel. Ladders for short-duration access only. Tools secured with lanyards. Exclusion zone established below the work area. Rescue plan in place. | |
| Contact with Electricity | All circuits to be isolated, locked off, and proven dead using a GS38-compliant tester before work begins. Live work is prohibited unless unavoidable and under a specific permit-to-work. | |
| Asbestos Exposure | Check the site's asbestos register before drilling into any building fabric constructed before 2000. If no register exists or asbestos is suspected, work must stop until a survey is completed. | |
| Manual Handling | Heavy components (condensers, fan coils) to be handled by two persons or with mechanical aids (trolleys, lifts). Operatives trained in correct lifting techniques. | |
| Refrigerant Gas Release | Only F-Gas certified engineers to handle refrigerants. Wear appropriate PPE (gloves, goggles). Ensure good ventilation. Use a refrigerant leak detector. | |
| Hot Works (Brazing) | Obtain a hot works permit. Remove combustible materials from the area. Keep a suitable fire extinguisher immediately available. Maintain a fire watch for 60 minutes after completion. | |
| Slips, Trips, and Falls | Maintain good housekeeping. Keep work areas clear of trailing cables, tools, and waste. Clean up any spills immediately. |
Personal Protective Equipment (PPE)
| Item | Standard |
|---|---|
| Safety helmet (where risk of falling objects) | BS EN 397 |
| High-visibility clothing | BS EN ISO 20471 |
| Safety footwear (with toe and mid-sole protection) | BS EN ISO 20345 |
| Safety glasses / goggles | BS EN 166 |
| Cut-resistant gloves | BS EN 388 |
| Thermal gloves (for refrigerant handling) | BS EN 511 |
| Hearing protection (for noisy works) | BS EN 352 |
| Respiratory Protective Equipment (FFP3 for silica dust) | BS EN 149 |
Emergency & first aid arrangements
| Site First Aider | to be confirmed |
| First Aid Kit Location | In company vehicle and with site welfare facilities |
| Emergency Contact | A. Supervisor, 01283 000000 |
| Fire Assembly Point | As identified during site induction |
| Nearest A&E Hospital | Royal Devon and Exeter Hospital, Exeter (confirm before start on site) |
| Accident Reporting | All accidents, incidents, and near misses must be reported immediately to the supervisor. Serious incidents will be reported under RIDDOR 2013. |
Rescue plan
A rescue plan is required as this work involves working at height.
- Named rescuer role: A competent person on site, trained in work at height rescue. The second operative will act as the designated rescuer.
- Rescue equipment: The primary rescue method is via the ground controls of the MEWP. A fully charged mobile phone for emergency calls will be carried at all times.
- Rescue method (from MEWP):
- In the event of an operative becoming incapacitated in the MEWP basket, the second operative on the ground will immediately take control using the ground-level controls.
- The basket will be lowered to the ground at the nearest safe location.
- First aid will be administered as required.
- The emergency services will be called if necessary.
- Rescue method (from mobile tower/ladder):
- In the event of a fall or incident, the second operative will raise the alarm immediately.
- DO NOT attempt a rescue that puts the rescuer at risk.
- Call the emergency services immediately.
- Provide assistance from a safe position until emergency services arrive.
- Suspension trauma note: If a fall is arrested by a harness, the suspended person is at risk of suspension trauma, which can be fatal. Rescue must be swift. Inform the ambulance service that the casualty has been suspended in a harness.
- Emergency services call sequence:
- Dial 999 and ask for the Ambulance service.
- State the site address: Unit 4, Example Trading Estate, Exeter EX2 8XX.
- Provide the nature of the emergency and the number of casualties.
- A designated person will meet the ambulance at the site entrance and direct them to the incident location.
- The supervisor must be informed immediately.
Sign-off / declaration
I confirm that I have read and understood the contents of this method statement. I will comply with the specified safe working procedures and controls. I am competent to carry out the tasks assigned to me and will raise any safety concerns with my supervisor.
| Name | Role | Signature | Date |
|---|---|---|---|
Supervisor's Confirmation: I confirm that the required actions have been completed and the control measures described in this document are in place before work commences.
| Name | Role | Signature | Date |
|---|---|---|---|
| A. Supervisor | Supervisor |
What a compliant Method Statement must contain
- A numbered sequence from set-up to clean-down
- The specific plant, equipment and isolation points named at each step
- Measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s)
- Competence requirements and PPE
Why a drainage engineer's Method Statement gets rejected
- Abstract steps ('isolate and verify') with nothing measurable
- A likelihood × severity scoring table bolted on (that belongs in the risk assessment)
- Steps that skip the actual sequence a job really follows
- No named competent person for the steps that need one
Already have one? Check it against the standard, free.
Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.
Drainage Engineers hazards it must cover
Typical drainage engineer work, meaning Installs, clears, repairs and surveys below-ground drainage systems, including excavating trenches, rodding and jetting blockages, relining pipes, and inspecting sewers by CCTV camera., brings hazards a Method Statement has to address:
- Confined space entry into manholes and chambers
- Hydrogen sulphide and methane from sewage and decomposing matter
- Biological contamination from raw sewage (leptospirosis, hepatitis)
- Collapse of unsupported excavations and trench walls
- High-pressure water jetting causing injection injuries and lacerations
- Asbestos in pre-2000 pitch-fibre and asbestos-cement pipes
Generate your Method Statement in minutes
Built to the correct published standard for a drainage engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Method StatementFAQ
Do drainage engineers legally need a Method Statement?
A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For drainage engineer work, meaning Installs, clears, repairs and surveys below-ground drainage systems, including excavating trenches, rodding and jetting blockages, relining pipes, and inspecting sewers by CCTV camera., it is the document a client, principal contractor or inspector expects to see, grounded in the recognised safe-system-of-work format (HSE guidance).
What must a drainage engineer's Method Statement contain?
At minimum: A numbered sequence from set-up to clean-down; the specific plant, equipment and isolation points named at each step; measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s); competence requirements and PPE.
Why does a drainage engineer's Method Statement get rejected?
The usual reasons: abstract steps ('isolate and verify') with nothing measurable; A likelihood × severity scoring table bolted on (that belongs in the risk assessment); steps that skip the actual sequence a job really follows; no named competent person for the steps that need one.
Which regulation is a drainage engineer's Method Statement written under?
MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.
How fast can I get a Method Statement?
A couple of minutes. Describe the job, and RAMSReady writes a Method Statement for your exact drainage engineer job live against the correct standard, with a review date and a sign-off/records section.
Not writing this one today?
We will email you a one page overview of what RAMSReady covers, so you have it when you need it.
Want to see how it would work for your firm?
Tell us roughly what you run and who keeps your records, and we will come back to you.