Method Statement · Drainage Contractors

Method Statement for Drainage Contractors

A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. Below: what a drainage contractor's Method Statement must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant Method Statement must contain

  • A numbered sequence from set-up to clean-down
  • The specific plant, equipment and isolation points named at each step
  • Measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s)
  • Competence requirements and PPE

Why a drainage contractor's Method Statement gets rejected

  • Abstract steps ('isolate and verify') with nothing measurable
  • A likelihood × severity scoring table bolted on (that belongs in the risk assessment)
  • Steps that skip the actual sequence a job really follows
  • No named competent person where the law requires one

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Drainage Contractors hazards it must cover

Typical drainage contractor work, meaning drain repairs, CCTV surveys, jetting, excavation and new connections, brings hazards a Method Statement has to address:

  • confined spaces and toxic or oxygen-deficient atmospheres in chambers
  • trench collapse in excavations
  • high-pressure water jetting injuries
  • biological hazards (leptospirosis, hepatitis) from sewage
  • striking buried services

Generate your Method Statement in minutes

Built to the correct published standard for a drainage contractor: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your Method Statement

FAQ

Do drainage contractors legally need a Method Statement?

A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For drainage contractor work, meaning drain repairs, CCTV surveys, jetting, excavation and new connections, it is the document a client, principal contractor or inspector expects to see, grounded in the recognised safe-system-of-work format (HSE guidance).

What makes a drainage contractor's Method Statement fail?

The usual reasons: Abstract steps ('isolate and verify') with nothing measurable; A likelihood × severity scoring table bolted on (that belongs in the risk assessment); Steps that skip the actual sequence a job really follows. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a Method Statement?

A couple of minutes. Describe the job, and RAMSReady writes a Method Statement for your exact drainage contractor job live against the correct standard, with a review date and a sign-off/records section.