RAMS for Drainage Engineers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a drainage engineer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a drainage engineer's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Drainage Engineers hazards it must cover

Typical drainage engineer work, meaning Installs, clears, repairs and surveys below-ground drainage systems, including excavating trenches, rodding and jetting blockages, relining pipes, and inspecting sewers by CCTV camera., brings hazards a RAMS has to address:

  • Confined space entry into manholes and chambers
  • Hydrogen sulphide and methane from sewage and decomposing matter
  • Biological contamination from raw sewage (leptospirosis, hepatitis)
  • Collapse of unsupported excavations and trench walls
  • High-pressure water jetting causing injection injuries and lacerations
  • Asbestos in pre-2000 pitch-fibre and asbestos-cement pipes

Generate your RAMS in minutes

Built to the correct published standard for a drainage engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do drainage engineers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For drainage engineer work, meaning Installs, clears, repairs and surveys below-ground drainage systems, including excavating trenches, rodding and jetting blockages, relining pipes, and inspecting sewers by CCTV camera., it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a drainage engineer's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact drainage engineer job live against the correct standard, with a review date and a sign-off/records section.