What to Do When a Client Says Your RAMS Is Not Site Specific

Getting your RAMS bounced back with the comment "not site specific" is one of the most common rejections on construction and maintenance projects. It is also one of the most frustrating, especially if you spent time on the document. Before you resubmit the same file with the site address typed in, it is worth understanding what the feedback actually means and what a proper fix looks like.

What the feedback really means

A RAMS (Risk Assessment plus Method Statement) must reflect the real conditions of the actual job you are about to do. The risk assessment element sits under the duty in Regulation 3 of the Management of Health and Safety at Work Regulations 1999, which requires a "suitable and sufficient" assessment. On construction projects, CDM 2015 also requires contractors to plan and manage work so that it is carried out safely.

"Not site specific" usually means one or more of the following:

  • The hazards listed could belong to any job anywhere, not this job at this site.
  • The controls described do not reflect the actual environment (access, ground conditions, proximity to the public, live services, other trades).
  • There is no reference to the site's own rules, permit systems or emergency arrangements.
  • The method statement describes a generic sequence that bears no clear relationship to the physical layout of the work area.

A principal contractor or client reviewing your RAMS needs to be able to read it and recognise the site. If they cannot, the document cannot be meaningfully checked against reality, and it offers very little protection to you or your workers if something goes wrong.

Step one: ask for specific feedback

If the rejection note is vague, go back and ask which sections failed and why. A short conversation with the site manager or HSE coordinator will save you rewriting the wrong parts. Keep that exchange in writing.

Step two: gather the site-specific information you are missing

This is where most generic RAMS fall down. Before you can write a proper document, you need:

  • The site address and a description of the specific work area (floor, zone, grid reference if relevant).
  • The site induction pack or site rules, so you can reference permit-to-work systems, site speed limits, designated routes, welfare facilities and muster points by name.
  • A utility survey or confirmation of buried/overhead services in the work area.
  • Details of other trades working nearby and any sequencing constraints.
  • The principal contractor's construction phase plan (you are entitled to relevant extracts under CDM 2015).
  • Environmental conditions: confined space, height, proximity to the public, traffic management in place.

If you have not yet visited the site, you may need a pre-start visit. A RAMS written purely from memory or a previous similar job will almost always read as generic, because it is.

Step three: revise systematically, not cosmetically

Work through your risk assessment and apply the hierarchy of control to each hazard using what you now know about this site:

  1. Eliminate the hazard where possible (can you move the task to avoid the buried cable run entirely?).
  2. Substitute a safer approach (lower-reach equipment instead of working at height).
  3. Apply engineering controls that are available on this site (edge protection already installed by another trade, ventilation systems in place).
  4. Administrative controls that reference site-specific procedures (the permit-to-work number format this site uses, the site emergency number, the nearest hospital with A&E).
  5. PPE last, and specify what is required by the site rules as well as by the task.

Common signs that a risk assessment is still generic after revision: the controls say "follow manufacturer's instructions" without naming the equipment, or "wear appropriate PPE" without listing what. Replace those phrases with specifics.

For the method statement, write the sequence of work as it will actually happen in that work area. Name the access point, the route to the work zone, where materials will be stored on that site, and how waste will be removed using the site's system.

Step four: cross-reference the site emergency arrangements

Every RAMS should include the site-specific emergency contact numbers, the assembly point location, the procedure for raising the alarm and the nearest hospital. These details come from the site induction and the construction phase plan. If yours are still blank or say "as per site rules", fill them in.

Step five: resubmit with a cover note

When you send the revised document, include a short note explaining what you changed and why. This demonstrates professionalism and makes the reviewer's job easier. It also creates a record that you engaged with the feedback rather than simply reissuing the same document.

A word on template RAMS

Starting from a template is sensible and saves time. The problem arises when the template is treated as the finished product. A template provides the structure and the generic hazard categories. The site-specific information is the layer you must add every single time, for every new job, even if the task is familiar. No two sites are identical.

If a client says your RAMS is not site specific, they are usually right. Treat the rejection as useful feedback rather than a bureaucratic obstacle, fix the substance rather than the surface, and you will spend less time in the resubmission cycle and more time on the tools.

Need the document itself?

RAMSReady generates RAMS, risk assessments, method statements, COSHH and fire risk assessments to the correct published standard, or check your existing one free.

More from the RAMSReady library

What to Do When a Client Says Your RAMS Is Not Site Specific