What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a steeplejack's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Steeplejacks hazards it must cover

Typical steeplejack work, meaning Inspecting, repairing and maintaining tall structures such as chimneys, steeples, towers and masts, working at extreme height using ropes, ladders or scaffold, brings hazards a RAMS has to address:

  • Work at extreme height with fall from height risk
  • Rope access and rigging equipment failure
  • Structural instability of deteriorating masonry or steelwork
  • Struck by falling debris or dislodged material
  • Lightning strike and adverse weather exposure at height
  • Asbestos in pre-2000 fabric of industrial chimney linings and flashings

Generate your RAMS in minutes

Built to the correct published standard for a steeplejack: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do steeplejacks legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For steeplejack work, meaning Inspecting, repairing and maintaining tall structures such as chimneys, steeples, towers and masts, working at extreme height using ropes, ladders or scaffold, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a steeplejack's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact steeplejack job live against the correct standard, with a review date and a sign-off/records section.

Related guides