RAMS · Refrigeration Engineers

RAMS for Refrigeration Engineers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For refrigeration engineer work, it has to cover refrigerant gases (HFCs, HCFCs, ammonia): pressure release, asphyxiation and toxic exposure. It must include A hazard table with a likelihood × severity score before and after controls.

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a refrigeration engineer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

A finished example

Example RAMS from a similar trade (Air Conditioning Engineers)

We do not have a finished RAMS for refrigeration engineers yet, so this one is from air conditioning engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.

The job it was written for: “Job: install, commission, service and maintain air conditioning and refrigeration systems in commercial and residential buildings, including pipework, electrical connections and refrigerant handling. Commercial unit, occupied during working hours, 2 operatives, 4 days. Main risks: Refrigerant gases: toxic, asphyxiation and pressure release risks; Electrical isolation: live conductors during installation and fault-finding; Working at height: rooftop and ceiling-void mounted units.”. Names and contact details are anonymised.

EXAMPLE

Risk Assessment & Method Statement: Air Conditioning Systems

FieldDetail
Document TitleRAMS: Installation, Commissioning & Maintenance of Air Conditioning Systems
CompanyExample Air Conditioning Engineer Ltd
AuthorA. Supervisor
Date14 October 2026
VersionV1.0
Review Date14 October 2027

Company details

FieldDetail
Company nameExample Air Conditioning Engineer Ltd
Addressto be confirmed
Registration numberto be confirmed
Phoneto be confirmed
Named supervisorA. Supervisor
Insurance valid untilto be confirmed

Project / job information

FieldDetail
Site addressUnit 4, Example Trading Estate, Exeter EX2 8XX
ClientExample Client
Start date14 October 2026
Expected duration4 days
Number of operatives2

Scope of works

This document covers the safe working procedure for the installation, commissioning, service and maintenance of air conditioning and refrigeration systems at the specified commercial premises.

The scope includes:

  • Site setup, survey and confirmation of isolation points.
  • Installation of indoor and outdoor units, associated pipework and electrical connections.
  • Pressure testing, charging with refrigerant and commissioning of new systems.
  • Service and maintenance of existing systems, including fault-finding and repair.
  • Work may take place at height (rooftop and ceiling voids) and involves handling pressurised refrigerant gases.

This assessment is based on the Management of Health and Safety at Work Regulations 1999, reg 3(1), and the recording of significant findings under reg 3(6).

Hazard identification table

HAZARDRISK / WORST-CASE OUTCOMEWHO IS AT RISKRISK BEFORE CONTROLS: L × S = Score (Rating)CONTROL MEASURES (in hierarchy order, specific and measurable)RISK AFTER CONTROLS: L × S = Score (Rating)
Asbestos Containing Materials (ACMs)Uncontrolled release of asbestos fibres leading to inhalation and potential long-term fatal lung disease (asbestosis, mesothelioma).Operatives, client staff, public4 × 5 = 20 (Very High)⛔ STOP, CONFIRM AT SITE SURVEY: Before any intrusive work, obtain and review the site's asbestos register (as required by the Control of Asbestos Regulations 2012, reg 4). If no register exists, or work is outside its scope, work must stop and a Refurbishment & Demolition survey must be commissioned. All operatives to hold current UKATA-approved Asbestos Awareness (Category A) training. No work is to proceed on any material suspected of containing asbestos. Report any suspect materials to the supervisor and client immediately.2 × 5 = 10 (High)
Contact with live electrical circuitsSevere electric shock, burns, cardiac arrest, death. Arc flash causing fire or explosion.Operatives4 × 5 = 20 (Very High)DEAD WORKING IS THE DEFAULT under the Electricity at Work Regulations 1989. The circuit supplying the equipment MUST be safely isolated before work begins. Safe Isolation Procedure: 1. Identify correct circuit. 2. Isolate power (MCB/fused spur). 3. Secure with a multi-lock hasp and personal padlock; supervisor retains key. 4. Post 'Caution: Do Not Turn On' signs. 5. PROVE DEAD on all conductors using a GS38-compliant two-pole voltage indicator, which has been proven on a known source or proving unit immediately before and after the test. For live fault-finding (only where essential), this must be conducted under a permit-to-work system by a competent person using insulated tools, GS38 test equipment, and appropriate PPE (arc-rated gloves/face shield).1 × 5 = 5 (Medium)
Work at height (accessing rooftop/ceiling void units)Fall from height resulting in multiple serious injuries or death. Falling objects striking persons below.Operatives, client staff, public4 × 5 = 20 (Very High)Hierarchy of control (Work at Height Regulations 2005): Avoid work at height if possible. Where required, use collective fall prevention: a MEWP (IPAF 3a/3b qualified operator) or a properly erected mobile access tower (PASMA trained operative) is the preferred method over ladders. All equipment to be inspected before use. A clear exclusion zone must be cordoned off below the work area using barriers and signs to prevent access. Tools to be secured via lanyards. See specific Rescue Plan in section 11.2 × 5 = 10 (High)
Sudden release of pressurised refrigerantAsphyxiation in enclosed spaces, severe frostbite (cold burns), serious eye injury, component failure causing high-velocity projectiles.Operatives, client staff4 × 4 = 16 (Very High)Work to be carried out only by F-Gas certified engineers. Wear suitable PPE: safety glasses (BS EN 166) and thermal gloves (BS EN 511). Ensure good ventilation in the work area, especially for indoor units. Use correct, maintained refrigerant recovery unit and pressure-rated gauges/hoses. Never heat cylinders with a naked flame. Follow a controlled procedure for charging and recovery.2 × 4 = 8 (Medium)
Entry into ceiling voids or enclosed plant roomsAsphyxiation from refrigerant leak, entrapment, heat stress. Potential for oxygen-deficient atmosphere.Operatives3 × 5 = 15 (High)⛔ STOP, CONFIRM AT SITE SURVEY: Any ceiling void, ductwork or plant room which is substantially enclosed must be assessed for risks under the Confined Spaces Regulations 1997 before entry. A specific safe system of work and emergency rescue arrangements must be in place as a legal precondition to entry. This may include gas monitoring, a top person, and specific rescue equipment.2 × 5 = 10 (High)
Manual handling of heavy/awkward items (units, cylinders)Musculoskeletal injury (sprains, strains, back injury) from lifting, carrying or positioning heavy equipment.Operatives3 × 3 = 9 (Medium)Assess the load before lifting (Manual Handling Operations Regulations 1992). Use mechanical aids wherever possible (e.g. sack truck, trolley, genie lift). For two-person lifts, ensure clear communication and coordinated movements. Break down loads into smaller components if possible. Adopt correct lifting posture: straight back, bend knees.2 × 3 = 6 (Medium)
Slips, trips and falls on the same levelFractures, sprains, impact injuries from falling onto tools or materials.Operatives, client staff, public3 × 3 = 9 (Medium)Maintain good housekeeping throughout the task. Keep work areas clear of trailing cables, tools and waste materials. Use cable covers where cables cross walkways. Clean up any spills immediately. Ensure adequate lighting.1 × 3 = 3 (Low)
Interaction with client staff / publicInjury to non-site personnel from moving into the work area, contact with tools, materials or falling objects.Client staff, public3 × 4 = 12 (High)Cordon off the immediate work area using physical barriers (e.g. Chapter 8 barriers) and clear "No Unauthorised Access" signage. Communicate work activities and timings with the client representative. Ensure operatives are identifiable (hi-vis clothing, company branding) and act professionally.1 × 4 = 4 (Low)

Method statement

Note: The responsible person on site (A. Supervisor) must confirm that all control measures identified in the risk assessment are in place and operational before work commences.

1. Pre-start checks and site arrival

  1. All operatives will report to the client representative on arrival for site induction.
  2. The supervisor will walk the route to the work area, identifying any site-specific hazards.
  3. The supervisor will locate and review the site asbestos register. Work will not proceed if the register is missing or does not cover the work area.
  4. The supervisor will locate the dedicated electrical isolation points for all equipment to be worked on.
  5. A designated safe area for tool and material storage will be established.

2. Setting up the work area

  1. Erect barriers and warning signs around the immediate internal and external work zones. For work at height, the exclusion zone must extend beyond the potential drop zone of any materials.
  2. Lay down dust sheets to protect client property and flooring.
  3. Move all tools and equipment to the work area safely, using mechanical aids for heavy items.

3. Electrical isolation

  1. The F-Gas certified engineer will perform the safe isolation procedure as detailed in the risk assessment.
  2. The engineer will use a GS38-compliant voltage indicator (proven on a proving unit before and after) to PROVE DEAD on all incoming conductors and terminals.
  3. The key for the isolation padlock will be retained by the person carrying out the work.

4. Installation / Servicing of AC units

  1. For work at height: Erect the mobile access tower or position the MEWP as per manufacturer's instructions. Inspect the equipment before use. The operative using the equipment must hold the relevant PASMA or IPAF certification.
  2. Decommissioning (if required): Connect a dedicated refrigerant recovery unit to the system. Recover all refrigerant into a designated, correctly labelled recovery cylinder. Record the weight of recovered gas.
  3. Pipework: Disconnect or install copper pipework. Ensure all connections are correctly flared and torqued.
  4. System installation: Mount new indoor and outdoor units securely using the specified fixings.
  5. Pressure testing: Once the system is sealed, charge with oxygen-free nitrogen (OFN) to the manufacturer's specified test pressure. Monitor the pressure for the required duration (e.g., 24 hours) to confirm there are no leaks.
  6. Evacuation: After a successful pressure test, release the OFN and connect a vacuum pump. Evacuate the system to a deep vacuum (e.g., below 500 microns) to remove all air and moisture.

5. Commissioning

  1. Calculate the correct refrigerant charge based on pipe lengths and manufacturer data.
  2. Charge the system with the correct weight of new refrigerant using digital scales.
  3. Once charged, reinstate electrical power following the reverse of the isolation procedure.
  4. Power on the system and carry out full commissioning checks: test operating pressures, temperatures, and electrical readings. Ensure all functions are operational.

6. Completion and clean-down

  1. Ensure the system is left in a safe and operational condition.
  2. Remove all tools, equipment, and waste materials from the work area.
  3. Use an industrial vacuum cleaner to remove any dust and debris created.
  4. Remove all barriers and signs.
  5. Sign off any site permits with the client representative and provide a summary of the work completed.

Hazardous substances used

SubstanceWhere usedHazardControlsCOSHH assessment ref.Completed, date & initials
Refrigerant gas (e.g. R32, R410a)AC systemsHighly flammable (R32), high pressure, asphyxiant, cryogenic contact hazard.F-Gas certified operatives only. No naked flames. Good ventilation. Wear safety glasses and thermal gloves. Handle cylinders with care.COSHH-1 (generate)
Oxygen Free Nitrogen (OFN)Pressure testingHigh-pressure gas, asphyxiant.Controlled release. Secure cylinders upright. Use correct regulator and gauges. Transport with valve caps on.COSHH-2 (generate)
Brazing fumes / fluxSoldering pipeworkInhalation of metallic oxides can cause fume fever. Irritant to respiratory system.Ensure adequate ventilation. If indoors, use portable fume extraction. Wear FFP3 mask if required.COSHH-3 (generate)
Dust (general, potentially silica)Drilling into masonryInhalation can cause respiratory irritation or long-term disease (silicosis).Use dust extraction at source on power tools. Wear FFP3 rated dust mask. Dampen down surfaces where appropriate.COSHH-4 (generate)

Competence and training

RoleRequired competence (cards, tickets, training)Evidence held
All operativesSite induction; manual handling trainingto be confirmed by Example Air Conditioning Engineer Ltd
AC EngineersF-Gas Category 1 qualification; ECS card (or equivalent); safe isolation trainingto be confirmed by Example Air Conditioning Engineer Ltd
Operatives working at heightWorking at height training; PASMA for mobile access towers; IPAF (3a or 3b) for MEWPsto be confirmed by Example Air Conditioning Engineer Ltd
All operativesAsbestos awareness (Category A) training, refreshed every 12 monthsto be confirmed by Example Air Conditioning Engineer Ltd
Named first aider (to be confirmed)First Aid at Work (FAW) certificate, in dateto be confirmed by Example Air Conditioning Engineer Ltd

PPE requirements

ItemStandard
Safety boots with toe & midsole protectionBS EN ISO 20345
High-visibility clothingBS EN ISO 20471
Safety glasses / gogglesBS EN 166
Cut-resistant glovesBS EN 388
Thermal gloves (for refrigerant handling)BS EN 511
Hearing protection (if required)BS EN 352
Respiratory Protective Equipment (RPE) - FFP3 maskBS EN 149

Emergency arrangements

ItemDetail
Site emergency contactA. Supervisor, 01283 000000
First aiderto be confirmed
First aid kit locationIn company vehicle
Nearest A&E hospitalRoyal Devon and Exeter Hospital, Exeter. confirm before start on site
Fire assembly pointAs per site induction
Fire procedureOn discovering a fire, raise the alarm immediately. Do not attempt to fight the fire unless trained to do so. Evacuate to the designated assembly point. Call 999 and state the site address and nature of the emergency.
Spill procedureFor refrigerant release, evacuate the immediate area and ensure ventilation. For other minor spills, use spill kits located in the company vehicle.

Rescue plan

A specific rescue plan is required for all work at height, as per the Work at Height Regulations 2005. Rescue must be carried out promptly to minimise harm.

  • Rescuer role: The second operative on site will act as the designated rescuer. This person must be competent, not involved in the work at height, and must remain at ground level to monitor the task.
  • Rescue equipment: A fully charged mobile phone for emergency calls. Access to MEWP ground controls. If using ladders, a second ladder for assistance. All access equipment itself (tower, MEWP) is part of the rescue equipment.
  • Rescue method (MEWP): In the event of platform failure or an incapacitated operative, the ground-level rescuer will operate the emergency lowering controls from the base of the MEWP to bring the platform safely to the ground.
  • Rescue method (Access Tower / Ladder): If an operative is incapacitated, the rescuer will first assess the situation from a position of safety. If safe to do so, they will access the casualty to provide aid. If the casualty can self-rescue with assistance, this will be the primary method. If not, the emergency services will be called immediately.
  • Emergency services call sequence:
    1. Designated rescuer dials 999 for the Ambulance service.
    2. State the service required, site address: Unit 4, Example Trading Estate, Exeter EX2 8XX, and the nature of the incident (e.g., "Man fallen from height", "Operative collapsed in MEWP basket").
    3. Provide details of the best access point for the emergency vehicle.
    4. The rescuer will meet the ambulance crew at the site entrance to direct them.
    5. Inform supervisor A. Supervisor immediately.

Environmental considerations

  • All waste, including packaging and old components, will be segregated and removed from site for correct disposal by a licensed waste carrier.
  • All refrigerant gases will be handled in accordance with F-Gas regulations to prevent release to the atmosphere.
  • Measures will be taken to control dust and noise to minimise impact on the surrounding occupied premises.

Risk matrix key & sign-off

Likelihood1 (Very unlikely)2 (Unlikely)3 (Possible)4 (Likely)5 (Very likely)
Severity
5 (Catastrophic)510152025
4 (Major)48121620
3 (Moderate)3691215
2 (Minor)246810
1 (Insignificant)12345
RatingAction
16-25 (Very High)Unacceptable, stop work, implement additional controls immediately
10-15 (High)Significant controls required, senior management attention
5-9 (Medium)Adequate controls required, monitor and review
1-4 (Low)Acceptable, manage by routine procedures

Operative sign-off / declaration

I confirm that I have read and understood the content of this Risk Assessment and Method Statement. I will comply with the specified control measures and safe systems of work. I am aware of my responsibilities under the Health and Safety at Work etc. Act 1974. I will raise any concerns with my supervisor.

NameRole / TitleSignatureDate

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a refrigeration engineer's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited, such as CDM 2015 named for work that is not construction

Already have one? Check it against the standard, free.

Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.

Refrigeration Engineers hazards it must cover

Typical refrigeration engineer work, meaning Install, commission, maintain and decommission refrigeration and air-conditioning systems, including pipework, compressors, condensers and refrigerant circuits, in commercial and industrial premises, brings hazards a RAMS has to address:

  • Refrigerant gases (HFCs, HCFCs, ammonia): pressure release, asphyxiation and toxic exposure
  • Electrical isolation of high-voltage compressor and control equipment
  • Pressurised systems: risk of uncontrolled release during brazing, pressure testing or component removal
  • Ammonia (R717), an acutely toxic refrigerant in a pressurised system (PSSR 2000)
  • Working at height on rooftop plant and in plant rooms with restricted access
  • Asbestos in pre-2000 plant room fabric and lagging disturbed during installation or maintenance

Generate your RAMS in minutes

Built to the correct published standard for a refrigeration engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do refrigeration engineers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For refrigeration engineer work, meaning Install, commission, maintain and decommission refrigeration and air-conditioning systems, including pipework, compressors, condensers and refrigerant circuits, in commercial and industrial premises, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What must a refrigeration engineer's RAMS contain?

At minimum: A hazard table with a likelihood × severity score before and after controls; controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last); A numbered, step-by-step method statement for the actual task; PPE to BS EN standards, emergency arrangements, and an operative sign-off.

Why does a refrigeration engineer's RAMS get rejected?

The usual reasons: residual risk dropped from high to low on PPE or 'competent operatives' alone; generic hazards that could apply to any job; no method statement, or one too vague to follow on site; the wrong legal basis cited, such as CDM 2015 named for work that is not construction.

Which regulation is a refrigeration engineer's RAMS written under?

MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact refrigeration engineer job live against the correct standard, with a review date and a sign-off/records section.

Not writing this one today?

We will email you a one page overview of what RAMSReady covers, so you have it when you need it.

Want to see how it would work for your firm?