Risk Assessment · Lift Engineers
Risk Assessment for Lift Engineers
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For lift engineer work, it has to cover falls into the lift shaft and from the car roof. It must include hazards specific to the actual task, site and materials.
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. Below: what a lift engineer's Risk Assessment must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
A finished example
Example Risk Assessment from a similar trade (HVAC & Ventilation Engineers)
We do not have a finished Risk Assessment for lift engineers yet, so this one is from hvac & ventilation engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.
The job it was written for: “Job: air-conditioning, ventilation and ductwork installation and service. Commercial unit, occupied during working hours, 3 operatives, 2 days. Main risks: working at height and in roof voids/plant rooms; electrical and refrigerant hazards; manual handling of plant.”. Names and contact details are anonymised.
Risk Assessment, HVAC & Ventilation Installation and Service
Document title: Risk Assessment for HVAC & Ventilation Works Company: Example HVAC Engineer Ltd Author: A. Supervisor Date of assessment: 14 October 2026 Version: V1.0 Review date: 14 October 2027
Company details
| Field | Detail |
|---|---|
| Company name | Example HVAC Engineer Ltd |
| Address | to be confirmed |
| Registration number | to be confirmed |
| Phone | to be confirmed |
| Named supervisor | A. Supervisor |
| Insurance valid until | to be confirmed |
Task / Activity & Location
Task: Installation and servicing of air-conditioning units, ventilation systems, and associated ductwork. The work involves manual handling of plant, working at height, work in roof voids and plant rooms, and electrical and refrigerant system connections.
Location: Unit 4, Example Trading Estate, Exeter EX2 8XX. The premises are an occupied commercial unit. Work areas will be segregated from site staff and the public.
Hazard Assessment Table
| HAZARD | WHO might be harmed and HOW | RISK BEFORE CONTROLS: L × S = Score (Rating) | CONTROL MEASURES | RISK AFTER CONTROLS: L × S = Score (Rating) | ACTION BY WHOM | BY WHEN |
|---|---|---|---|---|---|---|
| Working at height (e.g. from ladders, steps, mobile towers, MEWPs) to access plant, ducting runs. | Operatives: fall from height resulting in major or fatal injury. <br>Site staff/public: struck by falling tools or materials causing serious injury. | 5 × 4 = 20 (Very High) | 1. Avoid: Complete as much assembly as possible at ground level. <br>2. Prevent falls (collective): Use suitable access equipment with priority given to collective protection, e.g. mobile scaffold tower with guardrails (erected by a competent PASMA-trained person) or a MEWP (operated by a competent IPAF-trained person). <br>3. Prevent falls (personal): Only use ladders or stepladders for short-duration, low-risk tasks where a risk assessment justifies it. Ensure ladders are industrial grade, inspected, correctly angled, secured, and a 3-point contact is maintained. <br>4. Mitigate: Establish an exclusion zone below the work area using barriers and signage to prevent access. Tools to be secured via lanyards where appropriate. <br>5. PPE: Hard hats to be worn in the designated work zone. | 2 × 4 = 8 (Medium) | A. Supervisor | Before start of work |
| Electrical shock and burns from contact with live circuits during installation or servicing of HVAC plant. | Operatives: electric shock, burns, or fatality from direct contact with live parts. <br>Site staff: shock from inadequately isolated or earthed equipment. | 5 × 5 = 25 (Very High) | 1. ⛔ STOP, CONFIRM AT SITE SURVEY: All work is to be carried out on dead circuits. Live working is prohibited under the Electricity at Work Regulations 1989 unless it meets the strict criteria of regulation 14, which is not anticipated for this task. <br>2. Safe Isolation: Follow HSG85 safe isolation procedure. Identify circuit, isolate and lock off, post caution signs, prove dead with a GS38-compliant voltage tester (check tester against proving unit before and after use). The operative undertaking the work retains the key to the lock. <br>3. Engineering: Use 110V CTE tools and equipment. Ensure all equipment is visually inspected before use and has a valid portable appliance test record if required by company policy. Use RCD protection for all temporary power supplies. <br>4. Competence: Work undertaken only by competent persons qualified to BS 7671 (18th Edition). | 1 × 5 = 5 (Medium) | Competent Electrician | Before start of work |
| Entry into a confined space (e.g. roof voids, enclosed plant rooms, large ductwork) with restricted access/egress. | Operatives: entrapment, asphyxiation from hazardous atmosphere, heat stress, collapse of structures. Fatality or serious injury. | 4 × 5 = 20 (Very High) | 1. ⛔ STOP, CONFIRM AT SITE SURVEY: Entry into any confined space is prohibited until a specific safe system of work, including emergency rescue arrangements, has been established and briefed, as required by the Confined Spaces Regulations 1997. <br>2. Avoid: First, establish if the work can be completed without entry. <br>3. Safe System of Work: If entry is unavoidable, a permit-to-work system will be implemented. This will include atmospheric testing before and during entry, provision of ventilation, suitable lighting, and a top person maintaining communication. <br>4. Rescue: Suitable and sufficient emergency rescue arrangements must be in place before entry begins. See Rescue Plan section. | 2 × 5 = 10 (High) | A. Supervisor | Before entry |
| Exposure to asbestos containing materials (ACMs) during work on building fabric, plant or pipework in a pre-2000 building. | Operatives and site staff: inhalation of asbestos fibres leading to long-latency fatal diseases (mesothelioma, asbestosis). | 4 × 5 = 20 (Very High) | 1. ⛔ STOP, CONFIRM AT SITE SURVEY: Do not start any work that disturbs the building fabric until the site asbestos register has been checked and confirmed. The age of the building is unknown, so asbestos is presumed present. <br>2. Survey: If no register is available, or the planned work is outside its scope, work must not proceed until a refurbishment and demolition (R&D) survey is completed by a qualified surveyor. <br>3. Action: If ACMs are identified and will be disturbed, they must be removed by a licensed asbestos removal contractor under controlled conditions. Example HVAC Engineer Ltd operatives are not to work on or disturb ACMs. <br>4. Information: All operatives to have up-to-date asbestos awareness training (UKATA Category A). | 1 × 5 = 5 (Medium) | A. Supervisor | Before start of work |
| Manual handling of heavy or awkward items such as AC units, duct sections, fan motors, and toolboxes. | Operatives: musculoskeletal injuries (sprains, strains, back injuries) from lifting, carrying, pushing or pulling loads. | 4 × 3 = 12 (High) | 1. Avoid/Automate: Use mechanical aids where possible, e.g. pallet trucks, trolleys, scissor lifts, or material hoists. <br>2. Reduce Load: Break down loads into smaller, lighter components. Plan for two-person or team lifts for any items over 25 kg, ensuring a clear plan is communicated beforehand. <br>3. Safe Technique: All operatives to be trained in correct kinetic lifting techniques. Plan routes to be clear of obstructions. Ensure good grip and stable footing. <br>4. PPE: Wear suitable safety footwear and gloves to improve grip and protect hands. | 2 × 3 = 6 (Medium) | All operatives | During work |
| Slips, trips and falls on the same level due to trailing cables, tools, materials, packaging, or uneven surfaces. | Operatives and site staff: fractures, sprains, bruises, or head injuries from falling. | 3 × 3 = 9 (Medium) | 1. Housekeeping: Maintain a high standard of housekeeping. Keep work areas tidy, store materials in designated areas, and remove waste promptly. <br>2. Cable Management: Route cables away from walkways or use cable ramps/covers. Do not trail cables across corridors or access routes. <br>3. Segregation: Cordon off the immediate work area to prevent unauthorised access. <br>4. PPE: Wear safety footwear with non-slip soles. | 2 × 2 = 4 (Low) | All operatives | During work |
| Hazardous substances (refrigerant gases, cleaning fluids, lubricants, dust). | Operatives: skin irritation/dermatitis, eye damage, respiratory irritation, or asphyxiation from release of refrigerant. | 3 × 4 = 12 (High) | 1. COSHH: Obtain Safety Data Sheets (SDS) for all substances. Carry out COSHH assessments and follow the specified controls. See Hazardous Substances section. <br>2. Refrigerants: All work on refrigerant systems to be carried out by F-Gas certified, competent persons. Ensure good ventilation. Use a refrigerant leak detector. <br>3. Dust: For any drilling/cutting into masonry, use on-tool extraction (LEV) and wear FFP3 respiratory protection. <br>4. PPE: Wear appropriate gloves (e.g. nitrile for solvents, thermal for refrigerants) and eye protection (BS EN 166). | 2 × 3 = 6 (Medium) | A. Supervisor | Before use |
Hazardous substances used
| Substance | Where used | Hazard | Controls | COSHH assessment ref. |
|---|---|---|---|---|
| Refrigerant Gas (type to be confirmed) | Air conditioning system charging and service | High pressure, asphyxiant, frostbite | F-Gas certified operatives only. Good ventilation. Leak detection. Thermal gloves and safety glasses. | COSHH-1 (generate) |
| Cleaning solvents/degreasers | Cleaning coils and components | Skin/eye irritant, flammable vapour | Good ventilation. Nitrile gloves and safety glasses. No ignition sources. | COSHH-2 (generate) |
| Sealants/Adhesives | Ductwork sealing | Skin/eye irritant | Follow manufacturer's instructions. Wear gloves and eye protection. | COSHH-3 (generate) |
| Respirable Crystalline Silica (RCS) dust | Drilling/cutting masonry | Carcinogen, causes silicosis | On-tool water suppression or dust extraction (M or H class). FFP3 RPE. | COSHH-4 (generate) |
Competence and training
| Role | Required competence (cards, tickets, training) | Evidence held |
|---|---|---|
| All operatives | CSCS card (or equivalent); site induction; manual handling training; asbestos awareness (UKATA Cat A). | to be confirmed by Example HVAC Engineer Ltd |
| Operatives working at height | Working at height training; PASMA for mobile access towers; IPAF (3a/3b) for MEWPs. | to be confirmed by Example HVAC Engineer Ltd |
| Confined space entrants and top person | Confined space training to the risk level assessed (e.g. City & Guilds 6150); escape breathing apparatus training where required. | to be confirmed by Example HVAC Engineer Ltd |
| Refrigerant handling operatives | F-Gas Category I certification. | to be confirmed by Example HVAC Engineer Ltd |
| Named first aider | First Aid at Work (FAW) or Emergency First Aid at Work (EFAW) certificate, in date. | to be confirmed by Example HVAC Engineer Ltd |
Emergency arrangements
| Item | Detail |
|---|---|
| Site address | Unit 4, Example Trading Estate, Exeter EX2 8XX |
| Emergency contact | A. Supervisor, 01283 000000 |
| First aid provision | Suitable first aid kit located in site vehicle. |
| Named first aider | to be confirmed |
| Nearest A&E hospital | Royal Devon and Exeter Hospital, Exeter. Confirm before start on site. |
| Fire assembly point | As per site induction. Located in the main car park. |
Rescue plan
A specific rescue plan must be produced and briefed to all team members before any work at height or in a confined space commences.
Rescue from height (e.g. MEWP or Tower Scaffold)
- Rescuer role: Competent ground person / second operative.
- Rescue equipment: MEWP ground controls, mobile phone. For scaffolding, ladders for access.
- Rescue method (MEWP): The trained ground person will operate the MEWP's ground-level emergency lowering controls to bring the platform down safely.
- Rescue method (Scaffold): A second operative will access the casualty, provide immediate aid if safe, and assist them down the scaffold. If the casualty is unable to move, the emergency services will be called to perform a technical rescue. Do not move an injured person unless they are in immediate danger.
- Emergency services: Dial 999. State the site address and postcode, access point, and nature of the incident (e.g. "person fallen at height"). A designated person will meet the ambulance at the site entrance.
Rescue from a confined space
- Rescuer role: Trained top person / standby operative.
- Rescue equipment: To be determined by the specific confined space risk assessment. This may include a tripod, winch, rescue harness, escape BA set, and communication equipment, all kept at the entry point.
- Rescue method: The rescue plan is non-entry. The top person will raise the alarm and attempt to retrieve the entrant using the pre-rigged winch system without entering the space themselves. NO-ONE is to enter the space to attempt a rescue unless they are a trained member of a designated rescue team with the correct equipment.
- Emergency services: Dial 999. State the site address, that it is a confined space rescue, the nature of the emergency, and any known atmospheric hazards. A designated person will meet the emergency services at the site entrance.
Significant findings summary
This risk assessment identifies significant hazards from working at height, use of electricity, potential entry into confined spaces, and potential exposure to asbestos. The key control measures are the strict adherence to safe systems of work including: the use of collective fall prevention for work at height; a mandatory safe isolation procedure for all electrical work; and a prohibition on disturbing any building fabric or entering any confined space until specific surveys and safe systems of work, including rescue plans, are in place. Competent, trained operatives are essential for all tasks.
Declaration and Sign-off
The undersigned confirms that all required actions identified in this risk assessment have been completed, and that the specified control measures are in place and have been communicated to all relevant personnel.
| Name | Role | Signature | Date |
|---|---|---|---|
Risk Matrix Key
| Likelihood | Description | Severity | Description |
|---|---|---|---|
| 5 | Very likely, expected to happen frequently | 5 | Catastrophic, death or multiple serious injuries |
| 4 | Likely, will probably happen at some point | 4 | Major, serious injury, long-term disability, RIDDOR |
| 3 | Possible, might happen occasionally | 3 | Moderate, medical treatment, 3+ day absence |
| 2 | Unlikely, could happen but not expected | 2 | Minor, first aid treatment, minor injury |
| 1 | Very unlikely, could happen but very rare | 1 | Insignificant, no injury, minor inconvenience |
| Rating | Score | Action Required |
|---|---|---|
| Very High | 16-25 | Unacceptable, stop work, implement additional controls immediately |
| High | 10-15 | Significant controls required, senior management attention |
| Medium | 5-9 | Adequate controls required, monitor and review |
| Low | 1-4 | Acceptable, manage by routine procedures |
Review
This risk assessment must be reviewed by the date of next review specified at the top of this document, or immediately if there is any significant change to the work, equipment, substances used, or location, or following any accident or near-miss.
What a compliant Risk Assessment must contain
- Hazards specific to the actual task, site and materials
- Who might be harmed and how, for each hazard
- The controls already in place PLUS any further action needed
- A before/after risk score and a review date
Why a lift engineer's Risk Assessment gets rejected
- Copied from a generic example instead of written for the actual task
- Controls that don't match what the business actually does
- No record of who does the further actions, or by when
- An auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'
Already have one? Check it against the standard, free.
Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.
Lift Engineers hazards it must cover
Typical lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, brings hazards a Risk Assessment has to address:
- falls into the lift shaft and from the car roof
- crushing between the car and shaft or counterweight
- electrical isolation and stored energy
- lone working in machine rooms and pits
- manual handling of motors and doors
Generate your Risk Assessment in minutes
Built to the correct published standard for a lift engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Risk AssessmentFAQ
Do lift engineers legally need a Risk Assessment?
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the 5-step method (INDG163).
What must a lift engineer's Risk Assessment contain?
At minimum: hazards specific to the actual task, site and materials; who might be harmed and how, for each hazard; the controls already in place PLUS any further action needed; A before/after risk score and a review date.
Why does a lift engineer's Risk Assessment get rejected?
The usual reasons: copied from a generic example instead of written for the actual task; controls that don't match what the business actually does; no record of who does the further actions, or by when; an auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'.
Which regulation is a lift engineer's Risk Assessment written under?
MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.
How fast can I get a Risk Assessment?
A couple of minutes. Describe the job, and RAMSReady writes a Risk Assessment for your exact lift engineer job live against the correct standard, with a review date and a sign-off/records section.
Not writing this one today?
We will email you a one page overview of what RAMSReady covers, so you have it when you need it.
Want to see how it would work for your firm?
Tell us roughly what you run and who keeps your records, and we will come back to you.