What a compliant Risk Assessment must contain
- Hazards specific to the actual task, site and materials
- Who might be harmed and how, for each hazard
- The controls already in place PLUS any further action needed
- A before/after risk score and a review date
Why a lift engineer's Risk Assessment gets rejected
- Copied from a generic example (HSE: 'would not satisfy the law')
- Controls that don't match what the business actually does
- No record of who does the further actions, or by when
- An auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'
Already have one? Check it against the standard, free.
Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.
Check yours freeLift Engineers hazards it must cover
Typical lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, brings hazards a Risk Assessment has to address:
- falls into the lift shaft and from the car roof
- crushing between the car and shaft or counterweight
- electrical isolation and stored energy
- lone working in machine rooms and pits
- manual handling of motors and doors
Generate your Risk Assessment in minutes
Built to the correct published standard for a lift engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Risk AssessmentFAQ
Do lift engineers legally need a Risk Assessment?
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the 5-step method (INDG163).
What makes a lift engineer's Risk Assessment fail?
The usual reasons: Copied from a generic example (HSE: 'would not satisfy the law'); Controls that don't match what the business actually does; No record of who does the further actions, or by when. RAMSReady generates one to the correct published form and avoids these.
How fast can I get a Risk Assessment?
A couple of minutes. Describe the job, and RAMSReady writes a Risk Assessment for your exact lift engineer job live against the correct standard, with a review date and a sign-off/records section.