RAMS · Lift Engineers

RAMS for Lift Engineers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a lift engineer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a lift engineer's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Lift Engineers hazards it must cover

Typical lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, brings hazards a RAMS has to address:

  • falls into the lift shaft and from the car roof
  • crushing between the car and shaft or counterweight
  • electrical isolation and stored energy
  • lone working in machine rooms and pits
  • manual handling of motors and doors

Generate your RAMS in minutes

Built to the correct published standard for a lift engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do lift engineers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a lift engineer's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact lift engineer job live against the correct standard, with a review date and a sign-off/records section.