RAMS · Lift Engineers

RAMS for Lift Engineers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For lift engineer work, it has to cover falls into the lift shaft and from the car roof. It must include A hazard table with a likelihood × severity score before and after controls.

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a lift engineer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

A finished example

Example RAMS from a similar trade (HVAC & Ventilation Engineers)

We do not have a finished RAMS for lift engineers yet, so this one is from hvac & ventilation engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.

The job it was written for: “Job: air-conditioning, ventilation and ductwork installation and service. Commercial unit, occupied during working hours, 3 operatives, 2 days. Main risks: working at height and in roof voids/plant rooms; electrical and refrigerant hazards; manual handling of plant.”. Names and contact details are anonymised.

EXAMPLE

RAMS (Risk Assessment & Method Statement), HVAC Installation & Service

Document title: RAMS, HVAC & Ventilation Installation & Service Company: Example HVAC Engineer Ltd Author: A. Supervisor Date: 14 October 2026 Version: V1.0 Review date: 14 October 2027

Company details

FieldDetail
Company nameExample HVAC Engineer Ltd
Addressto be confirmed
Registration numberto be confirmed
Phone01283 000000
Named supervisorA. Supervisor
Insurance valid untilto be confirmed

Project / Job information

FieldDetail
SiteUnit 4, Example Trading Estate, Exeter EX2 8XX
ClientExample Client
Duration2 days (commencing 14 October 2026)
ScopeInstallation and service of air-conditioning, ventilation and ductwork.

Scope of works

The work involves the installation and servicing of commercial air-conditioning, ventilation systems and associated ductwork at an occupied commercial unit. The scope covers:

  • Pre-start survey, site induction and establishment of a safe, segregated work area.
  • Safe isolation of electrical and mechanical services under a permit-to-work system if required by the client.
  • Use of mobile access equipment (e.g., mobile access tower, MEWP) for working at height to install units and ducting.
  • Manual and mechanical handling of new units, duct sections, tools and equipment.
  • Installation of indoor and outdoor AC units, ventilation fans and associated plant.
  • Core drilling for service penetrations.
  • Connection of electrical power and control wiring to units.
  • Handling, charging and leak testing of refrigerant gases by F-Gas registered personnel.
  • System commissioning, testing and handover.
  • Removal of all waste materials and equipment, leaving the area clean and tidy.

Hazard identification and risk assessment

This assessment of risk is carried out in compliance with the Management of Health and Safety at Work Regulations 1999, reg 3. The control measures identified must be implemented and maintained to ensure risks are controlled so far as is reasonably practicable.

| HAZARD | RISK / WORST-CASE OUTCOME | WHO IS AT RISK | RISK BEFORE CONTROLS: L × S = Score (Rating) | CONTROL MEASURES (in hierarchy order, specific and measurable) - | RISK AFTER CONTROLS: L × S = Score (Rating) | | Work at height (using ladders, towers, MEWPs) | Fall from height leading to major injury or death. Falling tools or materials striking people below. | Operatives, client staff, public | 5 × 4 = 20 (Very High) | Eliminate/Substitute: Work from ground level wherever possible. Pre-assemble ductwork sections on the ground.<br>Engineering Controls: Use of a mobile access tower (erected by a competent PASMA-trained person) or a MEWP (operated by a competent IPAF-trained person) as the primary means of access, in preference to ladders. Ensure guardrails and toeboards are correctly fitted. Establish an exclusion zone below the work area using barriers and warning signs.<br>Administrative Controls: All operatives to hold valid working at height training. Ladders for short-duration light tasks only, secured and used by competent persons. Tools secured by lanyards. Pre-use checks on all access equipment. See Rescue Plan.<br>PPE: Safety helmets (BS EN 397) worn in the work area. - | 2 × 4 = 8 (Medium) | | Confined space entry (roof voids, plant rooms, ductwork) | Asphyxiation from hazardous atmosphere, heat stress, entrapment, inability to rescue. Fire. | Operatives | 5 × 5 = 25 (Very High) | ⛔ STOP, CONFIRM AT SITE SURVEY: Entry into a confined space must not take place unless a safe system of work and suitable and sufficient emergency rescue arrangements have been established, as required by the Confined Spaces Regulations 1997. The following must be in place before entry:<br>1. Avoid entry: Complete work from outside the space if at all possible.<br>2. Permit-to-work: A formal permit system must be used, detailing isolations, atmospheric testing, authorised entrants, and rescue plan.<br>3. Atmospheric testing: Test for oxygen levels, flammable gases and toxic contaminants before entry and monitor continuously.<br>4. Ventilation: Provide mechanical ventilation where necessary.<br>5. Competence: All entrants, top persons and rescuers must be competent and specifically trained for their roles.<br>6. Rescue Plan: A detailed, tested rescue plan is mandatory. See Rescue Plan section. | 2 × 5 = 10 (High) | | Electrical work (installation, testing) | Electric shock, burns or electrocution from contact with live parts. Arcing causing fire or explosion. | Operatives, client staff | 5 × 5 = 25 (Very High) | Eliminate: All circuits to be worked on MUST be isolated from the supply and proven dead before work commences. Work will be carried out dead wherever reasonably practicable, in line with the Electricity at Work Regulations 1989.<br>Safe Isolation Procedure:<br>1. Identify correct circuit.<br>2. Isolate and secure using a dedicated lock and multi-lock hasp. Operative retains the key.<br>3. Post "Caution: Do Not Operate" notices at point of isolation.<br>4. Prove the test instrument (GS38 compliant) is working on a known live source or proving unit.<br>5. Prove the circuit is dead on all conductors.<br>6. Re-check the test instrument on the proving unit.<br>Live working is prohibited unless it meets all three conditions of EAWR reg 14, requiring specific risk assessment and authorisation.<br>Administrative Controls: Only competent electricians (qualified to BS 7671 18th Edition) to perform electrical connections and testing. Use of 110V CTE tools. Regular visual checks of all portable electrical equipment. - | 1 × 5 = 5 (Medium) | | Manual handling (AC units, ductwork, tools) | Musculoskeletal injuries (sprains, strains) from lifting, carrying or positioning heavy or awkward items. Crush injuries. | Operatives | 3 × 3 = 9 (Medium) | Eliminate/Substitute: Use mechanical lifting aids (e.g., genie lift, scissor lift, pallet truck) for all heavy components. Break down loads into smaller, manageable sections.<br>Engineering Controls: Ensure delivery vehicles can get as close to the work area as possible to minimise carrying distances.<br>Administrative Controls: A two-person lift must be used for any item that is awkward or over 20kg. All operatives trained in correct manual handling techniques. Ensure clear, unobstructed access routes. - | 2 × 3 = 6 (Medium) | | Slips, trips and falls on the same level | Sprains, fractures, cuts and bruises from falling over tools, materials, cables or on wet/uneven surfaces. | Operatives, client staff, public | 3 × 3 = 9 (Medium) | Administrative Controls: Maintain good housekeeping at all times. All materials and tools to be stored tidily away from walkways. Trailing cables to be covered with cable ramps or routed away from traffic routes. Spills to be cleaned up immediately. Work area to be well lit. Safety footwear to be worn.<br>PPE: Safety footwear with non-slip soles (BS EN ISO 20345). - | 1 × 3 = 3 (Low) | | Hazardous substances (refrigerant gas, cleaners, dust) | Skin/eye irritation, respiratory issues from inhalation, pressure injection injury, asphyxiation. Frostbite from refrigerant release. | Operatives, client staff | 4 × 4 = 16 (Very High) | Substitute: Use low-toxicity cleaning agents where possible.<br>Engineering Controls: Ensure good natural or mechanical ventilation. Use dust extraction on power tools for drilling/cutting masonry to control silica dust.<br>Administrative Controls: See COSHH Assessment. All operatives handling refrigerant must be F-Gas certified. Appropriate spill kits available. Minimum quantity of substances kept in the work area.<br>PPE: Appropriate gloves (e.g., thermal for refrigerants, nitrile for solvents), safety glasses (BS EN 166) and RPE (e.g., FFP3 mask for dust) to be worn as identified in the COSHH assessment. - | 2 × 4 = 8 (Medium) | | Noise (power tools, plant) | Noise-induced hearing loss. Nuisance to building occupants. | Operatives, client staff | 3 × 3 = 9 (Medium) | Engineering Controls: Use modern, well-maintained, quiet-running equipment. Use acoustic screens if necessary.<br>Administrative Controls: Rotate jobs to limit individual exposure time. Carry out noisy work at pre-agreed times to minimise disruption to the client. Post warning signs.<br>PPE: Hearing protection (BS EN 352) to be worn by operatives in designated hearing protection zones. - | 2 × 3 = 6 (Medium) |

Method statement: sequence of work

All work must be carried out in accordance with this method statement. Any deviation requires authorisation from the supervisor.

1. Pre-start and setup 1.1. All operatives to report to the site contact, sign in and undergo a site induction. 1.2. The supervisor will brief all operatives on this RAMS, confirming they have read and understood it. 1.3. Cordon off the immediate work area using barriers and warning signs to prevent unauthorised access. 1.4. Confirm the location of welfare facilities, first aid kit, and fire extinguishers.

2. Isolation of services 2.1. The competent electrician will identify the correct electrical circuits for the HVAC equipment. 2.2. Following the safe isolation procedure detailed in the risk assessment, the electrician will isolate, lock off, and prove dead all relevant circuits. A permit-to-work will be used if required by the client's site rules. 2.3. Any mechanical services (e.g., water) will be isolated at designated valves, which will be locked off and tagged.

3. Installation at height 3.1. Assemble mobile access tower (by a PASMA-trained operative) or position MEWP (by an IPAF-trained operative) on firm, level ground. 3.2. Conduct pre-use checks on the access equipment. 3.3. Hoist tools and materials securely; do not overload the platform. Use tool lanyards where appropriate. 3.4. Install fixings, brackets, and mount new AC units and ductwork sections as per manufacturer's instructions. 3.5. An exclusion zone will be maintained below the work area at all times.

4. Electrical and refrigerant work 4.1. The competent electrician will run new power and control wiring and make final connections to the isolated equipment. 4.2. Once connections are complete and covers are replaced, the circuit can be de-isolated and energised for testing. 4.3. A certified F-Gas engineer will connect refrigerant pipework, pressure test with inert gas (e.g., Oxygen-Free Nitrogen), evacuate the system, and charge with the correct refrigerant. Leak detection will be performed.

5. Servicing of existing units 5.1. Isolate and prove dead existing units before removing any covers or starting work. 5.2. Clean filters, coils, and fans using appropriate cleaning agents and methods. 5.3. Check all electrical connections for tightness and security. 5.4. Check refrigerant levels and system operation.

6. Commissioning and completion 6.1. Power on the system and carry out full commissioning tests to verify correct operation. 6.2. Demonstrate the system to the client and provide any relevant user documentation. 6.3. Tidy the work area, removing all waste, tools and surplus materials. 6.4. Sign out with the site contact and complete all necessary paperwork.

Hazardous substances used

A COSHH assessment must be completed for any substance brought to site or created by the work.

SubstanceWhere usedHazardControlsCOSHH assessment ref.
Silica dust (Respirable Crystalline Silica)Core drilling/cutting of masonryLung cancer, silicosis, serious respiratory diseaseUse of on-tool water suppression or dust extraction (H or M class). RPE (FFP3).COSHH-1 (generate)
Refrigerant gas (e.g., R32, R410A)Charging AC systemsAsphyxiant in confined spaces, frostbite, flammable (R32)Handled only by F-Gas certified engineers. Good ventilation. Safety glasses, thermal gloves.COSHH-2 (use)
Cleaning solvents / coil cleanerServicing and cleaning componentsSkin/eye irritation, inhalation of vapoursGood ventilation. Nitrile gloves, safety glasses.COSHH-3 (use)
Oxygen-Free Nitrogen (OFN)Pressure testing refrigerant linesHigh pressure gas, asphyxiantCorrect pressure regulator. Good ventilation. Secure cylinder.COSHH-4 (use)

Competence and training

RoleRequired competence (cards, tickets, training)Evidence held
All operativesCSCS card; site induction; manual handling trainingto be confirmed by Example HVAC Engineer Ltd
Operatives working at heightWorking at height training; PASMA for mobile access towers; IPAF for MEWPsto be confirmed by Example HVAC Engineer Ltd
Confined space entrants & top personConfined space training to the risk level assessed (e.g., City & Guilds 6150)to be confirmed by Example HVAC Engineer Ltd
Electricians18th Edition (BS 7671) qualification; ECS card; safe isolation trainingto be confirmed by Example HVAC Engineer Ltd
Refrigerant gas handlersF-Gas Category 1 qualificationto be confirmed by Example HVAC Engineer Ltd
Named first aider (to be confirmed)First Aid at Work (FAW) certificate, in dateto be confirmed by Example HVAC Engineer Ltd

PPE requirements

The following Personal Protective Equipment is mandatory for this work:

  • Head Protection: Safety helmet (BS EN 397)
  • Foot Protection: Safety boots with toe and midsole protection (BS EN ISO 20345)
  • Hand Protection: General handling gloves (BS EN 388); thermal gloves for refrigerant handling
  • Eye Protection: Safety glasses / goggles (BS EN 166)
  • High-Visibility Clothing: Hi-vis vest or jacket (BS EN ISO 20471)
  • Hearing Protection: Ear defenders or plugs (BS EN 352) to be worn during noisy operations
  • Respiratory Protection: FFP3 dust mask for drilling/cutting masonry

Emergency arrangements

  • Site Supervisor: A. Supervisor, 01283 000000
  • First Aider: to be confirmed
  • First Aid Kit Location: In site office and company vehicle.
  • Nearest A&E Hospital: Royal Devon and Exeter Hospital, Exeter (confirm before start on site).
  • Fire: On discovering a fire, raise the alarm immediately. Evacuate to the designated assembly point. Do not attempt to fight the fire unless trained to do so and it is safe.
  • Spills: Use spill kit located in the company vehicle to contain and clean up spills of any hazardous substances.

Rescue plan

A specific rescue plan is required for work at height and any confined space entry.

Rescue from Height (MEWP / Mobile Tower)

  • Rescuer: A second operative on the ground must be competent in the emergency lowering procedures for the MEWP, or in the safe dismantling of the mobile tower.
  • Rescue Equipment: MEWP ground controls, mobile phone.
  • Rescue Method (MEWP): In the event of platform failure or an operative becoming incapacitated, the ground-based operative will use the emergency lowering controls to bring the platform safely to the ground.
  • Rescue Method (Tower): In the event of an incident, a second operative will assist the casualty down the tower if they are able. If they are incapacitated, emergency services will be called immediately to perform the rescue. Do not attempt to move an injured person unless there is an immediate threat to their life.
  • Emergency Services Call: Dial 999. State the site address: Unit 4, Example Trading Estate, Exeter EX2 8XX. State the nature of the incident (e.g., "man fallen from height", "person incapacitated in a cherry picker"). Send one person to the site entrance to meet the ambulance.

Confined Space Rescue

  • This plan must be confirmed and tested on site before any entry.
  • Rescuer: A dedicated, trained 'top person' must be stationed at the entry point at all times. They must be competent in the rescue procedure and equipment.
  • Rescue Equipment: Full rescue kit including tripod, winch, harness, communication equipment, and resuscitation gear must be set up and checked at the entry point before entry.
  • Rescue Method: The primary method of rescue will be non-entry, using the tripod and winch to extract the casualty. The top person will raise the alarm and commence recovery. Under no circumstances should another person enter the space to attempt a rescue unless they are part of a designated and equipped rescue team.
  • Emergency Services Call: Dial 999. State the site address and specify "confined space incident". Provide details of any known atmospheric hazards.

Environmental considerations

  • All waste, including packaging, old components and pipework offcuts, will be segregated and removed from site for disposal by a licensed waste carrier.
  • Refrigerant gas will be handled in a way that prevents release to the atmosphere, in line with F-Gas regulations. Any recovered refrigerant will be transported in a dedicated cylinder for recycling or disposal.
  • Measures will be taken to control dust and noise to minimise impact on the local environment and building occupants.

Risk matrix key & sign-off

LikelihoodRatingSeverityRating
5: Very likelyExpected to happen frequently5: CatastrophicDeath or multiple serious injuries
4: LikelyWill probably happen at some point4: MajorSerious injury, long-term disability, RIDDOR reportable
3: PossibleMight happen occasionally3: ModerateMedical treatment, temporary disability, 3+ day absence
2: UnlikelyCould happen but not expected2: MinorFirst aid treatment, minor injury
1: Very unlikelyCould happen but very rare1: InsignificantNo injury, minor inconvenience
Risk RatingAction Required
16 - 25Very High: Unacceptable. Stop work, implement additional controls immediately
10 - 15High: Significant controls required, senior management attention
5 - 9Medium: Adequate controls required, monitor and review
1 - 4Low: Acceptable, manage by routine procedures

Declaration and operative sign-off

I have read and understood this Risk Assessment and Method Statement. I agree to work in accordance with its requirements and controls.

NameRoleSignatureDate

Supervisor's Confirmation: I confirm that the required actions have been completed and the controls specified in this document are in place.

NameRoleSignatureDate
A. SupervisorSupervisor

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a lift engineer's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited, such as CDM 2015 named for work that is not construction

Already have one? Check it against the standard, free.

Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.

Lift Engineers hazards it must cover

Typical lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, brings hazards a RAMS has to address:

  • falls into the lift shaft and from the car roof
  • crushing between the car and shaft or counterweight
  • electrical isolation and stored energy
  • lone working in machine rooms and pits
  • manual handling of motors and doors

Generate your RAMS in minutes

Built to the correct published standard for a lift engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do lift engineers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What must a lift engineer's RAMS contain?

At minimum: A hazard table with a likelihood × severity score before and after controls; controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last); A numbered, step-by-step method statement for the actual task; PPE to BS EN standards, emergency arrangements, and an operative sign-off.

Why does a lift engineer's RAMS get rejected?

The usual reasons: residual risk dropped from high to low on PPE or 'competent operatives' alone; generic hazards that could apply to any job; no method statement, or one too vague to follow on site; the wrong legal basis cited, such as CDM 2015 named for work that is not construction.

Which regulation is a lift engineer's RAMS written under?

MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact lift engineer job live against the correct standard, with a review date and a sign-off/records section.

Not writing this one today?

We will email you a one page overview of what RAMSReady covers, so you have it when you need it.

Want to see how it would work for your firm?

Tell us roughly what you run and who keeps your records, and we will come back to you.

Related guides

Other documents for Lift Engineers

Similar trades

Templates and tools