Method Statement · Lift Engineers
Method Statement for Lift Engineers
A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For lift engineer work, it has to cover falls into the lift shaft and from the car roof. It must include A numbered sequence from set-up to clean-down.
A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. Below: what a lift engineer's Method Statement must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
A finished example
Example Method Statement from a similar trade (Gas Engineers)
We do not have a finished Method Statement for lift engineers yet, so this one is from gas engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.
The job it was written for: “Job: boiler installation and servicing, pipework, commercial gas and landlord safety checks. Commercial unit, occupied during working hours, 3 operatives, 1 day. Main risks: gas escape, fire and explosion; carbon monoxide during commissioning and fault-finding; working in confined boiler rooms and lofts.”. Names and contact details are anonymised.
Method Statement: Gas Engineering Works, Unit 4, Example Trading Estate
| Field | Detail |
|---|---|
| Document Title | Method Statement: Gas Engineering Works |
| Company | Example Gas Engineer Ltd |
| Site Address | Unit 4, Example Trading Estate, Exeter EX2 8XX |
| Author | A. Supervisor |
| Date | 14 October 2026 |
| Version | V1.0 |
| Review Date | 14 October 2027 |
Company details
| Field | Detail |
|---|---|
| Company name | Example Gas Engineer Ltd |
| Address | to be confirmed |
| Registration number | to be confirmed |
| Phone | 01283 000000 |
| Named supervisor | A. Supervisor |
| Insurance valid until | to be confirmed |
Scope & description of works
This Method Statement covers the safe systems of work for commercial gas engineering activities, including boiler installation, servicing, associated pipework modifications, and landlord safety checks at the specified site.
The work will be undertaken by a team of three operatives over one day in a commercial unit that will remain occupied during working hours.
This document is based on a supporting risk assessment. It must be read and understood by all operatives before work commences.
Site, access & logistics
- Site Location: Unit 4, Example Trading Estate, Exeter EX2 8XX.
- Access: Operatives will report to the site contact on arrival for a local induction, which will include confirmation of welfare facilities, fire points, and any site-specific rules.
- Working Hours: Work will be conducted during normal business hours. Consideration must be given to the occupants of the building.
- Work Area Management: The immediate work area around the boiler and pipework will be segregated using safety signs and barriers as necessary to prevent unauthorised access.
- Deliveries: Any deliveries of boilers or materials will be coordinated with the site contact to ensure safe unloading and storage.
Key principles & safe-work basis
- Competence: All gas work will be carried out only by engineers who are registered with Gas Safe Register and hold the correct, current qualifications for the specific commercial appliances and work categories involved. Gas Safe registration details will be available for inspection.
- Safe Isolation: No work will commence on any gas or electrical system until it has been safely isolated and proven dead or at zero pressure.
- Gas: Isolation valves will be closed, locked where possible, and labelled. A tightness test will confirm zero pressure before breaking into any pipework.
- Electrical: Electrical supplies to boilers and controls will be isolated and locked off at the distribution board or fused spur. A multimeter and proving unit will be used to prove dead on all conductors before any work begins, in accordance with the Electricity at Work Regulations 1989.
- Gas Safety: All procedures will comply with the Gas Safety (Installation and Use) Regulations 1998.
Sequence of operations
1. Arrival and site preparation
- Sign in with the site contact and complete the site induction.
- Conduct a dynamic risk assessment of the work area, confirming the location of gas and electrical isolation points, fire extinguishers, and emergency exits.
- Communicate with building occupants regarding the planned works and duration of any service interruptions.
- Set up a safe work zone using barriers and warning signs. Ensure tools and materials are stored neatly to prevent trip hazards.
- Place fire extinguishers (CO2 and Dry Powder) adjacent to the work area.
2. Isolation of services
- Gas Isolation:
- Notify the building manager that the gas supply will be turned off.
- Isolate the gas supply at the main Emergency Control Valve (ECV) or a suitable downstream isolation valve serving the appliance.
- Affix a "Do Not Operate" notice to the valve.
- Test for tightness to confirm the integrity of the isolated section before proceeding.
- Electrical Isolation:
- Identify the correct circuit breaker or fuse supplying the boiler and associated controls.
- Isolate the supply and secure it with a lock-off device. The operative retains the key.
- Post a caution notice at the point of isolation.
- Using a GS38-compliant voltage tester and proving unit, prove the circuit is dead before and after testing on all conductors.
- Water Isolation:
- Isolate and drain the relevant sections of the heating and hot water system. Safely discharge water to a suitable drain.
3. Boiler servicing / installation works
- Servicing:
- Lay down dust sheets to protect the client's property.
- Remove boiler casings.
- Clean and inspect the main burner, heat exchanger, and condensate trap as per manufacturer's instructions.
- Check flue integrity and termination.
- Check system pressure and functionality of safety devices.
- Installation/Pipework:
- Where removing an old boiler, use correct manual handling techniques (team lift) or mechanical aids.
- Carry out any new pipework modifications using appropriate tools and techniques (e.g., soldering, press-fit). Ensure good ventilation if soldering.
- Mount the new boiler securely according to manufacturer's instructions.
- Connect pipework, flue, and condensate drain.
4. Recommissioning and testing
- Electrical Reinstatement: Remove lock-off devices and restore electrical power once all electrical work is complete.
- Gas Reinstatement:
- Remove gas isolation notices.
- Slowly restore the gas supply.
- Conduct a full system tightness test with a calibrated manometer to ensure no gas leaks.
- Purge air from the pipework to a safe, well-ventilated external area.
- Appliance Commissioning:
- Fire the appliance in accordance with manufacturer's instructions.
- Use a calibrated flue gas analyser to check combustion performance (CO/CO2 ratio) and ensure it is within safe parameters. Adjust as necessary.
- Test all safety devices, including flame failure devices and thermostats.
- Perform a spillage test on any open-flued appliances to ensure flue products are being safely removed.
- Check for gas leaks on all new connections using a Gas Leak Detection (GLD) fluid.
- Complete the commissioning logbook or Benchmark certificate.
5. Handover and completion
- Explain the work carried out to the client and demonstrate the operation of the new or serviced appliance.
- Provide the client with all relevant documentation, including safety certificates, operating instructions, and the Benchmark log.
- Ensure all guards and covers are correctly refitted.
- Remove all tools, equipment, waste materials, and old parts from the site.
- Leave the work area in a clean and tidy condition.
- Sign out with the site contact.
Plant, equipment & materials
| Equipment | Inspection/Use Requirement |
|---|---|
| Hand tools (spanners, grips, screwdrivers) | Visually inspect for damage before each use. |
| Cordless power tools (drills, drivers) | Visually inspect for damage. Ensure batteries are charged. |
| Gas leak detector (GLD) spray | Check expiry date. |
| Calibrated flue gas analyser | Check calibration certificate is in date. |
| Calibrated digital manometer | Check calibration certificate is in date. |
| GS38 compliant voltage tester & proving unit | Prove on a known source before and after use. |
| Step ladders | Inspect stiles, feet, and treads before use. Maintain 3 points of contact. |
| Dust sheets and floor protection | Place to protect client property and prevent slips on wet surfaces. |
| Fire extinguishers (CO2, Dry Powder) | Check gauges and tags are in date. Kept within easy reach of the work area. |
Hazardous substances used
The following substances may be used or generated. A full COSHH assessment is available for review.
| Substance | Where used | Hazard | Controls | COSHH assessment ref. |
|---|---|---|---|---|
| Carbon Monoxide (CO) | Generated during commissioning/fault-finding | Toxic gas, fatal if inhaled | Ensure adequate ventilation. Use a calibrated flue gas analyser. Use a personal CO alarm. | COSHH-1 (generate) |
| Solder Flux / Fumes | Soldering copper pipework | Respiratory irritant, fumes | Ensure good natural or mechanical ventilation. Avoid breathing fumes. | COSHH-2 (generate) |
| Jointing Compound | Sealing gas pipe threads | Skin irritant | Wear suitable gloves (e.g., nitrile). Wash hands after use. | COSHH-3 (generate) |
| Solvent Cleaner / Degreaser | Cleaning pipework and components | Flammable, skin/respiratory irritant | Ensure good ventilation. No ignition sources nearby. Wear gloves and eye protection. | COSHH-4 (generate) |
Competence and training
| Role | Required competence (cards, tickets, training) | Evidence held |
|---|---|---|
| All operatives | Site induction; manual handling training | to be confirmed by Example Gas Engineer Ltd |
| Gas engineers | Gas Safe registration for the appliance categories worked on (Commercial) | to be confirmed by Example Gas Engineer Ltd |
| Operatives carrying out electrical isolation | Competence in safe isolation procedures (e.g., City & Guilds 2393) | to be confirmed by Example Gas Engineer Ltd |
| Named first aider (to be confirmed) | First Aid at Work (FAW) certificate, in date | to be confirmed by Example Gas Engineer Ltd |
Key controls
The following key controls, identified in the risk assessment, must be implemented and confirmed by the site supervisor.
| Hazard | Recommended Control Measures | Completed - date & initials |
|---|---|---|
| Gas escape, fire, explosion | All gas work by Gas Safe registered engineers only. Full tightness test before and after work. Purge gas to a safe external area. No ignition sources during intrusive work. Fire extinguisher present. | |
| Carbon Monoxide (CO) poisoning | Use a calibrated flue gas analyser to ensure safe combustion. Ensure adequate ventilation in the work area. Use personal CO alarms. | |
| Electric shock or burns | Safe isolation procedure to be followed without deviation. Circuits proven dead with a GS38 tester before touching. All electrical work by competent persons only. | |
| ⛔ STOP, CONFIRM AT SITE SURVEY: Work in confined spaces (lofts, tight boiler rooms) | A safe system of work must be in place, complying with Confined Spaces Regulations 1997. This includes suitable and sufficient emergency rescue arrangements, which are a legal precondition to entry. Confirm if a permit-to-work system is required. Maintain communication with a colleague outside the space. | |
| Manual handling injuries (boilers, radiators) | Assess the load. Use a two-person lift for heavy or awkward items. Use mechanical aids (sack truck) where possible. Adopt correct lifting posture. | |
| Slips, trips, falls | Maintain good housekeeping. Keep tools and materials tidy. Cordon off the work area. Clean up any spills immediately. |
PPE
All personnel must wear the following PPE as required by the task.
| Item | Standard |
|---|---|
| Safety footwear (steel toe cap) | BS EN ISO 20345 |
| Safety glasses | BS EN 166 |
| Gloves (cut/abrasion resistant) | BS EN 388 |
| Knee pads | BS EN 14404 |
Emergency & first aid arrangements
- Site First Aider: to be confirmed
- First Aid Kit Location: In company vehicle.
- Emergency Contact: A. Supervisor, 01283 000000
- Nearest Hospital with 24-hr A&E: Royal Devon and Exeter Hospital (Wonford), Exeter. Confirm before start on site.
- In case of fire: Raise the alarm immediately. Evacuate to the designated assembly point. Call 999 and state the site address and nature of the emergency. Do not attempt to fight the fire unless trained and it is safe to do so.
- In case of gas escape: Extinguish all naked flames. Do not operate electrical switches. Evacuate the area. Isolate the supply if safe to do so. Call the National Gas Emergency Service on 0800 111 999.
Rescue plan
A specific rescue plan is required if work is confirmed inside a space designated as a confined space.
- Rescuer Role: A trained standby person will be designated to maintain communication and initiate rescue. Name to be confirmed on site.
- Rescue Equipment: To be confirmed based on the confined space assessment. May include harness, retrieval lines, breathing apparatus. This equipment must be present at the entry point before any entry occurs.
- Rescue Method: In an emergency, the standby person will raise the alarm immediately and initiate the non-entry rescue using the retrieval equipment. They will NOT enter the confined space. Emergency services will be called immediately.
- Emergency Services: Call 999. State the address: Unit 4, Example Trading Estate, Exeter EX2 8XX. State the nature of the incident is an emergency in a confined space. A designated person will meet the emergency services at the site entrance.
Sign-off and declaration
I have read and understood this Method Statement. I agree to work in accordance with its requirements and to raise any safety concerns with the supervisor. The required controls listed have been implemented and are in place.
| Name | Role | Signature | Date |
|---|---|---|---|
| Supervisor Confirmation: | A. Supervisor |
What a compliant Method Statement must contain
- A numbered sequence from set-up to clean-down
- The specific plant, equipment and isolation points named at each step
- Measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s)
- Competence requirements and PPE
Why a lift engineer's Method Statement gets rejected
- Abstract steps ('isolate and verify') with nothing measurable
- A likelihood × severity scoring table bolted on (that belongs in the risk assessment)
- Steps that skip the actual sequence a job really follows
- No named competent person for the steps that need one
Already have one? Check it against the standard, free.
Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.
Lift Engineers hazards it must cover
Typical lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, brings hazards a Method Statement has to address:
- falls into the lift shaft and from the car roof
- crushing between the car and shaft or counterweight
- electrical isolation and stored energy
- lone working in machine rooms and pits
- manual handling of motors and doors
Generate your Method Statement in minutes
Built to the correct published standard for a lift engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Method StatementFAQ
Do lift engineers legally need a Method Statement?
A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For lift engineer work, meaning lift installation, modernisation, servicing and breakdown call-outs, it is the document a client, principal contractor or inspector expects to see, grounded in the recognised safe-system-of-work format (HSE guidance).
What must a lift engineer's Method Statement contain?
At minimum: A numbered sequence from set-up to clean-down; the specific plant, equipment and isolation points named at each step; measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s); competence requirements and PPE.
Why does a lift engineer's Method Statement get rejected?
The usual reasons: abstract steps ('isolate and verify') with nothing measurable; A likelihood × severity scoring table bolted on (that belongs in the risk assessment); steps that skip the actual sequence a job really follows; no named competent person for the steps that need one.
Which regulation is a lift engineer's Method Statement written under?
MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.
How fast can I get a Method Statement?
A couple of minutes. Describe the job, and RAMSReady writes a Method Statement for your exact lift engineer job live against the correct standard, with a review date and a sign-off/records section.
Not writing this one today?
We will email you a one page overview of what RAMSReady covers, so you have it when you need it.
Want to see how it would work for your firm?
Tell us roughly what you run and who keeps your records, and we will come back to you.