Construction Risk Assessment Template

Generate a comprehensive construction risk assessment for your exact job. Identifies hazards, scores risks using a 5x5 matrix, and recommends specific control measures following the hierarchy of controls.

Legal Requirement for Risk Assessments

Under Regulation 3 of the Management of Health and Safety at Work Regulations 1999, every employer must carry out a suitable and sufficient assessment of the risks to their employees and anyone else affected by their work. If you have 5 or more employees, you must record the significant findings.

The Construction (Design and Management) Regulations 2015 (CDM 2015) place additional requirements on construction projects, including the preparation of a construction phase plan which must include risk assessments for all significant hazards.

The 5x5 Risk Matrix

RAMSReady uses the standard 5x5 risk matrix used across UK construction:

Likelihood (L)

  • 1: Very unlikely
  • 2: Unlikely
  • 3: Possible
  • 4: Likely
  • 5: Very likely

Severity (S)

  • 1: Insignificant
  • 2: Minor (first aid)
  • 3: Moderate (medical treatment)
  • 4: Major (RIDDOR)
  • 5: Catastrophic (death)

Risk Score = Likelihood x Severity. Scores of 1-4 are low risk, 5-9 medium, 10-15 high, and 16-25 are unacceptable and require immediate additional controls.

Hierarchy of Controls

  • Eliminate: remove the hazard entirely
  • Substitute: replace with something less hazardous
  • Engineering controls: isolate people from the hazard
  • Administrative controls: change the way people work
  • PPE: protect the individual (always last resort)

Generate your risk assessment

Describe your construction activity and get a professional risk assessment with hazard identification, risk matrix scoring, and specific control measures.

Generate Risk Assessment

Your first document is free. No card needed.

Risk Assessment: common questions

What must a Risk Assessment contain?

At minimum: hazards specific to the actual task, site and materials; who might be harmed and how, for each hazard; the controls already in place PLUS any further action needed; A before/after risk score and a review date.

Why does a Risk Assessment get rejected?

The usual reasons: copied from a generic example instead of written for the actual task; controls that don't match what the business actually does; no record of who does the further actions, or by when; an auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'.

Which regulation is a Risk Assessment written under?

MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.