Risk Assessment · Fire Extinguisher Servicing
Risk Assessment for Fire Extinguisher Servicing
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For fire extinguisher technician work, it has to cover pressurised cylinder failure during discharge testing or recharging. It must include hazards specific to the actual task, site and materials.
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. Below: what a fire extinguisher technician's Risk Assessment must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
A finished example
Example Risk Assessment from a similar trade (Air Conditioning Engineers)
We do not have a finished Risk Assessment for fire extinguisher servicing yet, so this one is from air conditioning engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.
The job it was written for: “Job: install, commission, service and maintain air conditioning and refrigeration systems in commercial and residential buildings, including pipework, electrical connections and refrigerant handling. Commercial unit, occupied during working hours, 3 operatives, 4 days. Main risks: Refrigerant gases: toxic, asphyxiation and pressure release risks; Electrical isolation: live conductors during installation and fault-finding; Working at height: rooftop and ceiling-void mounted units.”. Names and contact details are anonymised.
Risk Assessment, Example Air Conditioning Engineer Ltd
| Document Title | Risk Assessment |
| Company | Example Air Conditioning Engineer Ltd |
| Author | A. Supervisor |
| Date | 14 October 2026 |
| Version | V1.0 |
| Review Date | 14 October 2027 |
Company details
| Field | Detail |
|---|---|
| Company name | Example Air Conditioning Engineer Ltd |
| Address | to be confirmed |
| Registration number | to be confirmed |
| Phone | to be confirmed |
| Named supervisor | A. Supervisor |
| Insurance valid until | to be confirmed |
Task / Activity & Location
Activity: Installation, commissioning, servicing and maintenance of air conditioning and refrigeration systems. This includes running pipework, making electrical connections, pressure testing and handling refrigerants.
Location: Unit 4, Example Trading Estate, Exeter EX2 8XX. Work will take place internally within ceiling voids, plant rooms and occupied office areas, and externally on rooftop plant areas.
Legal basis: This risk assessment is conducted in accordance with The Management of Health and Safety at Work Regulations 1999 (MHSWR), regulation 3. The significant findings are recorded as required by MHSWR regulation 3(6) for employers with five or more employees.
Hazard Assessment
| HAZARD | WHO might be harmed and HOW | RISK BEFORE CONTROLS: L × S = Score (Rating) | CONTROL MEASURES (in hierarchy order: Eliminate, Substitute, Engineering, Admin, PPE) | RISK AFTER CONTROLS: L × S = Score (Rating) | ACTION BY WHOM | BY WHEN |
|---|---|---|---|---|---|---|
| Falls from height | Operatives falling from roofs, ladders, access platforms or through fragile surfaces in ceiling voids, leading to major or fatal injuries. Members of the public or site staff struck by falling tools or materials. | 5 × 4 = 20 (Very High) | 1. Avoid: Complete assembly work at ground level where possible. <br> 2. Prevent (Collective): Use MEWPs (e.g. scissor lift) with competent IPAF trained operators for access to high-level units, in preference to ladders. Where MEWPs are not practicable, use mobile scaffold towers erected by competent PASMA trained persons. Ensure all edge protection on rooftops is secure and sufficient. <br> 3. Prevent (Personal): For short-duration tasks where MEWPs/towers are not reasonably practicable, use industrial-grade ladders (EN 131), maintained in good condition, set on firm level ground, secured and used by trained operatives for access only. Ladders are not a work platform. <br> 4. Minimise: Establish exclusion zones below the work area using barriers and signage to prevent access by unauthorised personnel. Tools to be secured via lanyards when working at height. <br> 5. PPE: Head protection (BS EN 397) to be worn by all site operatives. | 2 × 4 = 8 (Medium) | A. Supervisor | Before work starts |
| Electric shock and burns | Operatives making contact with live electrical conductors during installation, servicing or fault-finding, causing electric shock, burns or death. Arcing may cause fire. | 5 × 5 = 25 (Very High) | 1. Eliminate: All work on electrical systems must be carried out with the circuits DEAD wherever possible. Live working is prohibited unless it meets the strict criteria of The Electricity at Work Regulations 1989, regulation 14. <br> 2. Engineering: Circuits must be isolated from the supply, locked off using a dedicated lock and key held by the person working on the circuit, and a caution notice posted at the point of isolation. <br> 3. Admin: Confirm isolation by PROVING DEAD using a GS38-compliant voltage tester and proving unit, before and after use. Test all conductors. Work is only to be carried out by competent persons holding relevant electrical qualifications. A permit-to-work system will be used for isolation of complex or critical systems. | 1 × 5 = 5 (Medium) | Competent Electrician | Before work starts |
| Exposure to asbestos | Operatives drilling, cutting or disturbing building materials (e.g. ceiling tiles, insulation boards, lagging) containing asbestos fibres, leading to inhalation and serious latent lung disease. | 4 × 5 = 20 (Very High) | ⛔ STOP, CONFIRM AT SITE SURVEY: <br> 1. Admin: Before any intrusive work begins, the client (Example Client) must provide a site-specific Asbestos Refurbishment Survey, conducted by a competent surveyor, in compliance with The Control of Asbestos Regulations 2012. <br> 2. Admin: NO WORK is to proceed on any building fabric until the survey has been received and reviewed. All operatives must have annual Asbestos Awareness (Category A) training. <br> 3. Admin: If any suspect material not on the survey is discovered, work must stop immediately in that area, it must be reported to the supervisor, and the area secured pending investigation by a specialist. | 1 × 5 = 5 (Medium) | A. Supervisor | Before work starts |
| Manual handling injuries | Operatives lifting and carrying heavy or awkward items such as condenser units, compressors, tools and refrigerant cylinders, causing musculoskeletal injuries (e.g. back sprains, strains). | 4 × 3 = 12 (High) | 1. Eliminate/Substitute: Arrange for mechanical lifting for all heavy items where possible. Have materials delivered close to the work area. Break down loads into smaller, lighter components. <br> 2. Engineering: Use mechanical aids such as sack trucks, panel lifters or a trolley. Use a two-person lift for any items over 25 kg, ensuring a clear route and good communication. <br> 3. Admin: All operatives to receive manual handling training on correct lifting techniques. Plan lifts before executing. <br> 4. PPE: Wear well-fitting gloves (BS EN 388) for grip and hand protection, and safety footwear (BS EN ISO 20345) to protect feet. | 2 × 3 = 6 (Medium) | All operatives | During work |
| Release of pressurised refrigerant gas | Operatives and others in the vicinity exposed to sudden, uncontrolled release of refrigerant gas due to equipment failure or incorrect handling. Risks include asphyxiation (in enclosed spaces), frostbite from cryogenic burns, and injury from ejected components. | 3 × 4 = 12 (High) | 1. Substitute: Use refrigerants with lower Global Warming Potential (GWP) where system design allows. <br> 2. Engineering: Use F-Gas certified refrigerant recovery units and gauges. Ensure all hoses and connections are in good condition and correctly rated for the pressures involved. <br> 3. Admin: Work to be carried out only by F-Gas certified engineers. Ensure adequate ventilation in the work area, especially in small rooms or plant rooms. No naked flames or ignition sources are permitted near refrigerant handling activities. A written pressure test procedure will be followed. <br> 4. PPE: Wear safety glasses (BS EN 166) and protective gloves (thermal/impervious) when connecting or disconnecting hoses. | 2 × 4 = 8 (Medium) | F-Gas Certified Engineer | During work |
| Working in ceiling voids | Operatives working in a restricted, poorly lit space. Risks include entry into a confined space with poor ventilation, contact with hidden services (electrical, pipework), dust/fibre inhalation, and falls through fragile ceiling structures. | 4 × 4 = 16 (Very High) | ⛔ STOP, CONFIRM AT SITE SURVEY: <br> 1. Admin: The ceiling void must be assessed against The Confined Spaces Regulations 1997. If it is a confined space (e.g. due to restricted access/egress and risk of asphyxiation from refrigerant leak), a full safe system of work including emergency rescue arrangements is a legal precondition to entry. See Rescue Plan section. <br> 2. Admin: Check asbestos survey before entry. Check for stability of any boards used for access. Provide temporary lighting. Test for services using a cable avoidance tool (CAT). <br> 3. PPE: RPE (e.g. FFP3 mask) must be worn to protect against dust. Head protection (BS EN 397) to be worn. | 2 × 4 = 8 (Medium) | A. Supervisor | Before work starts |
| Slips, trips and falls | Operatives and site users tripping over trailing leads, tools, equipment or debris in an occupied commercial building. Slipping on wet surfaces from leaks or weather. Causes minor to major injuries. | 3 × 3 = 9 (Medium) | 1. Engineering: Maintain good housekeeping. Keep work areas tidy, store materials away from walkways, and remove waste regularly. Use cordless tools where possible. Route any necessary cables away from walkways or cover with high-visibility, anti-trip cable protectors. <br> 2. Admin: Clean up any spills immediately. Cordon off the immediate work area to segregate from building occupants. Ensure adequate lighting. <br> 3. PPE: All operatives must wear safety footwear (BS EN ISO 20345) with non-slip soles. | 1 × 3 = 3 (Low) | All operatives | Daily |
| Fire | Use of brazing equipment for pipework installation creating an ignition source. Electrical faults or refrigerant gas ignition causing fire, risking injury to persons and damage to property. | 3 × 4 = 12 (High) | 1. Engineering: Use mechanical press-fit connections where system design allows, to eliminate hot works. <br> 2. Admin: Where brazing is unavoidable, a Hot Works Permit must be obtained from the client. Remove all combustible materials from the vicinity. The area must be inspected 60 minutes after work completion. <br> 3. Admin: A suitable fire extinguisher (e.g. dry powder or CO2) must be immediately available at the point of work. The operative must be trained in its use. Ensure familiarity with site fire evacuation procedures. | 1 × 4 = 4 (Low) | A. Supervisor | Before hot works |
Hazardous substances used
| Substance | Where used | Hazard | Controls | COSHH assessment ref. |
|---|---|---|---|---|
| Refrigerant Gas (e.g. R32, R410A) | AC systems | Asphyxiant in enclosed spaces, high pressure, flammable (R32), cryogenic burns. | Handled only by F-Gas certified engineers. Good ventilation. No ignition sources. Use of correct gauges and recovery equipment. Wear safety glasses and gloves. | COSHH-1 (generate) |
| Brazing Flux / Rods | Pipework joining | Fumes can cause respiratory irritation. | Undertake in well-ventilated areas. Follow manufacturer's safety data sheet. | COSHH-2 (generate) |
| Nitrogen (OFN) | Pressure testing / purging | High-pressure gas. Asphyxiant. | Use a suitable pressure regulator. Secure cylinders upright. Never use without a regulator. | COSHH-3 (generate) |
| Coil Cleaner / Biocide | Servicing | Irritant to skin and eyes. | Wear gloves (BS EN 374) and eye protection (BS EN 166). Follow manufacturer's safety data sheet. | COSHH-4 (generate) |
| Asbestos Fibres | Building fabric (pre-2000) | Inhalation causes fatal lung diseases. | Work must not disturb any fabric until a Refurbishment Asbestos Survey confirms its absence. | COSHH-5 (generate) |
Competence and training
| Role | Required competence (cards, tickets, training) | Evidence held |
|---|---|---|
| All operatives | CSCS card (or relevant trade scheme); site induction; manual handling training | to be confirmed by Example Air Conditioning Engineer Ltd |
| Operatives working at height | Working at height training; PASMA for mobile access towers; IPAF (3a/3b) for MEWPs | to be confirmed by Example Air Conditioning Engineer Ltd |
| All operatives | Asbestos awareness (Category A) training, refreshed every 12 months | to be confirmed by Example Air Conditioning Engineer Ltd |
| AC Engineer | F-Gas certification (City & Guilds 2079 or equivalent) | to be confirmed by Example Air Conditioning Engineer Ltd |
| AC Engineer (Electrical) | 18th Edition (BS 7671) qualification; ECS card; safe isolation training | to be confirmed by Example Air Conditioning Engineer Ltd |
| Named first aider | First Aid at Work (FAW) certificate, in date | to be confirmed by Example Air Conditioning Engineer Ltd |
Emergency arrangements
| Site First Aider | to be confirmed |
| First Aid Kit Location | In company vehicle |
| Emergency Contact | A. Supervisor, 01283 000000 |
| Nearest A&E Hospital | Royal Devon and Exeter Hospital (Wonford), Exeter, confirm before start on site |
| Site Fire Assembly Point | As identified during site induction |
| Spill Kit Location | In company vehicle |
Rescue plan
A rescue plan is required for all work at height. Entry into any confined space requires its own specific rescue plan as a legal precondition to entry.
Rescuer role: Competent person at ground level or on the working platform (e.g. MEWP operator).
Rescue equipment kept at work position:
- For MEWP work: Ground-level controls on the MEWP, fully charged mobile phone.
- For ladder work: A second person to assist and raise the alarm.
- For rooftop work: Fully charged mobile phone. A second person within communication range.
Rescue method (MEWP):
- In the event of platform failure or an incapacitated operative, the ground-based rescuer will operate the MEWP's emergency lowering controls from the ground to bring the platform down safely.
- The emergency services will be called immediately.
- First aid will be administered once safe to do so.
Rescue method (other work at height):
- The second person will immediately raise the alarm by calling the emergency services and the site supervisor.
- No attempt should be made to move an injured person unless they are in immediate danger, to avoid worsening injuries.
- Clear the access route for emergency services.
Emergency services call sequence:
- Dial 999: Ask for Ambulance.
- State: "This is an industrial incident at Unit 4, Example Trading Estate, Exeter, postcode EX2 8XX."
- Provide details: Nature of the incident (e.g. "a person has fallen from height"), exact location, number of casualties, and any known injuries.
- A designated person will meet the ambulance at the site entrance to direct them to the scene. The supervisor must be informed immediately.
Significant Findings Summary
This risk assessment identifies several high-risk activities associated with air conditioning engineering. The primary risks are falls from height, electric shock, exposure to asbestos, and the uncontrolled release of pressurised refrigerants. Control of these risks is dependent on robust safe systems of work, including:
- Prioritising collective fall prevention (e.g. MEWPs) over personal protection for work at height.
- A strict safe isolation and dead-working procedure for all electrical work.
- Obtaining and reviewing a Refurbishment Asbestos Survey before starting any intrusive work on the building fabric.
- Ensuring all refrigerant handling is performed by F-Gas certified personnel with correct equipment.
- Assessing any restricted work areas (e.g. ceiling voids) as potential confined spaces, which require a specific safe system of work and rescue plan prior to entry.
The control measures outlined in this assessment must be implemented and maintained by the supervisor and all operatives to reduce risks to an acceptable level.
Risk Matrix Key
| Likelihood | Severity |
|---|---|
| 1: Very unlikely | 1: Insignificant |
| 2: Unlikely | 2: Minor |
| 3: Possible | 3: Moderate |
| 4: Likely | 4: Major |
| 5: Very likely | 5: Catastrophic |
| Rating | Risk Level | Action Required |
|---|---|---|
| 1-4 | Low | Acceptable, manage by routine procedures |
| 5-9 | Medium | Adequate controls required, monitor and review |
| 10-15 | High | Significant controls required, senior management attention |
| 16-25 | Very High | Unacceptable, stop work, implement additional controls immediately |
Review
This risk assessment will be reviewed on or before 14 October 2027, or sooner if there is any reason to believe it is no longer valid, such as a change in work methods, equipment, substances, legislation, or following an accident or incident.
Declaration
I confirm that I have read and understood the requirements of this Risk Assessment. I will comply with the specified control measures and safe systems of work. I am aware of my responsibilities under The Health and Safety at Work etc. Act 1974 and The Management of Health and Safety at Work Regulations 1999.
| Name | Role | Signature | Date |
|---|---|---|---|
What a compliant Risk Assessment must contain
- Hazards specific to the actual task, site and materials
- Who might be harmed and how, for each hazard
- The controls already in place PLUS any further action needed
- A before/after risk score and a review date
Why a fire extinguisher technician's Risk Assessment gets rejected
- Copied from a generic example instead of written for the actual task
- Controls that don't match what the business actually does
- No record of who does the further actions, or by when
- An auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'
Already have one? Check it against the standard, free.
Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.
Fire Extinguisher Servicing hazards it must cover
Typical fire extinguisher technician work, meaning Inspecting, testing, recharging and maintaining portable fire extinguishers and fixed suppression systems in occupied and unoccupied premises across all sectors, brings hazards a Risk Assessment has to address:
- Pressurised cylinder failure during discharge testing or recharging
- CO2 asphyxiation risk in confined or poorly ventilated spaces during cylinder venting
- Manual handling of heavy charged cylinders, particularly large CO2 and water units
- Exposure to dry powder or halon-substitute agents causing respiratory irritation
- Working in live premises with fire alarm interference, requiring coordination with building management
- Asbestos in pre-2000 fabric when drilling or fixing brackets to walls and ceilings
Generate your Risk Assessment in minutes
Built to the correct published standard for a fire extinguisher technician: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Risk AssessmentFAQ
Do fire extinguisher servicing legally need a Risk Assessment?
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For fire extinguisher technician work, meaning Inspecting, testing, recharging and maintaining portable fire extinguishers and fixed suppression systems in occupied and unoccupied premises across all sectors, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the 5-step method (INDG163).
What must a fire extinguisher technician's Risk Assessment contain?
At minimum: hazards specific to the actual task, site and materials; who might be harmed and how, for each hazard; the controls already in place PLUS any further action needed; A before/after risk score and a review date.
Why does a fire extinguisher technician's Risk Assessment get rejected?
The usual reasons: copied from a generic example instead of written for the actual task; controls that don't match what the business actually does; no record of who does the further actions, or by when; an auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'.
Which regulation is a fire extinguisher technician's Risk Assessment written under?
MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.
How fast can I get a Risk Assessment?
A couple of minutes. Describe the job, and RAMSReady writes a Risk Assessment for your exact fire extinguisher technician job live against the correct standard, with a review date and a sign-off/records section.
Not writing this one today?
We will email you a one page overview of what RAMSReady covers, so you have it when you need it.
Want to see how it would work for your firm?
Tell us roughly what you run and who keeps your records, and we will come back to you.