Method Statement · Tarmac & Surfacing Contractors

Method Statement for Tarmac & Surfacing Contractors

A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. Below: what a surfacing contractor's Method Statement must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant Method Statement must contain

  • A numbered sequence from set-up to clean-down
  • The specific plant, equipment and isolation points named at each step
  • Measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s)
  • Competence requirements and PPE

Why a surfacing contractor's Method Statement gets rejected

  • Abstract steps ('isolate and verify') with nothing measurable
  • A likelihood × severity scoring table bolted on (that belongs in the risk assessment)
  • Steps that skip the actual sequence a job really follows
  • No named competent person where the law requires one

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Tarmac & Surfacing Contractors hazards it must cover

Typical surfacing contractor work, meaning roads, car parks, driveways and footpaths in hot-laid asphalt, brings hazards a Method Statement has to address:

  • burns from hot asphalt (up to 180°C)
  • bitumen fumes and RCS dust from planing
  • being struck by pavers, rollers and delivery lorries
  • working beside live traffic
  • noise and hand-arm vibration from compactors

Generate your Method Statement in minutes

Built to the correct published standard for a surfacing contractor: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your Method Statement

FAQ

Do tarmac & surfacing contractors legally need a Method Statement?

A safe system of work: the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For surfacing contractor work, meaning roads, car parks, driveways and footpaths in hot-laid asphalt, it is the document a client, principal contractor or inspector expects to see, grounded in the recognised safe-system-of-work format (HSE guidance).

What makes a surfacing contractor's Method Statement fail?

The usual reasons: Abstract steps ('isolate and verify') with nothing measurable; A likelihood × severity scoring table bolted on (that belongs in the risk assessment); Steps that skip the actual sequence a job really follows. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a Method Statement?

A couple of minutes. Describe the job, and RAMSReady writes a Method Statement for your exact surfacing contractor job live against the correct standard, with a review date and a sign-off/records section.

Related guides