RAMS · Tarmac & Surfacing Contractors

RAMS for Tarmac & Surfacing Contractors

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a surfacing contractor's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a surfacing contractor's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Tarmac & Surfacing Contractors hazards it must cover

Typical surfacing contractor work, meaning roads, car parks, driveways and footpaths in hot-laid asphalt, brings hazards a RAMS has to address:

  • burns from hot asphalt (up to 180°C)
  • bitumen fumes and RCS dust from planing
  • being struck by pavers, rollers and delivery lorries
  • working beside live traffic
  • noise and hand-arm vibration from compactors

Generate your RAMS in minutes

Built to the correct published standard for a surfacing contractor: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do tarmac & surfacing contractors legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For surfacing contractor work, meaning roads, car parks, driveways and footpaths in hot-laid asphalt, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a surfacing contractor's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact surfacing contractor job live against the correct standard, with a review date and a sign-off/records section.