RAMS for Steel Erectors
A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a steel erector's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
What a compliant RAMS must contain
- A hazard table with a likelihood × severity score before and after controls
- Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
- A numbered, step-by-step method statement for the actual task
- PPE to BS EN standards, emergency arrangements, and an operative sign-off
Why a steel erector's RAMS gets rejected
- Residual risk dropped from high to low on PPE or 'competent operatives' alone
- Generic hazards that could apply to any job
- No method statement, or one too vague to follow on site
- The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')
Already have one? Check it against the standard, free.
Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.
Check yours freeSteel Erectors hazards it must cover
Typical steel erector work, meaning structural steel erection, bolting, decking and edge protection on frames, brings hazards a RAMS has to address:
- falls from height and through unprotected openings
- crane and lifting operations (LOLER 1998)
- instability of partially erected frames
- dropped tools and bolts
- hot works during site welding and cutting
Generate your RAMS in minutes
Built to the correct published standard for a steel erector: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your RAMSFAQ
Do steel erectors legally need a RAMS?
A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For steel erector work, meaning structural steel erection, bolting, decking and edge protection on frames, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.
What makes a steel erector's RAMS fail?
The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.
How fast can I get a RAMS?
A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact steel erector job live against the correct standard, with a review date and a sign-off/records section.