Risk Assessment · Pressure Washing & Jet Washing

Risk Assessment for Pressure Washing & Jet Washing

A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For pressure-washing operative, it has to cover high-pressure injection injuries. It must include hazards specific to the actual task, site and materials. It must also include who might be harmed and how, for each hazard.

A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. Below: what a Risk Assessment for pressure-washing operative must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

A finished example

Example Risk Assessment for a pressure-washing operative job

The job it was written for: “Job: cleaning driveways, render, roofs, plant and commercial premises with high-pressure water. Commercial unit, occupied during working hours, 2 operatives, 2 days. Main risks: high-pressure injection injuries; slips on wet and algae-covered surfaces; working at height on roofs and render.”. Names and contact details are anonymised.

EXAMPLE

Risk Assessment, Pressure Washing & Jet Washing, Unit 4, Example Trading Estate, Exeter

Document TitleRisk Assessment
CompanyExample Contractor Ltd
AuthorA. Supervisor
Date14 October 2026
VersionV1.0
Review Date14 October 2027

Company details

FieldDetail
Company nameExample Contractor Ltd
Addressto be confirmed
Registration numberto be confirmed
Phoneto be confirmed
Named supervisorA. Supervisor
Insurance valid untilto be confirmed

Task / Activity & Location

Activity: High-pressure water jetting (pressure washing) to clean external building surfaces including driveways, render, roofs, and plant equipment.

Location: Unit 4, Example Trading Estate, Exeter EX2 8XX. The work area is around an occupied commercial unit.

Duration: 2 operatives, 2 days.

Legal basis: This assessment is conducted in accordance with The Management of Health and Safety at Work Regulations 1999 (MHSWR). It records the significant findings of the risk assessment as required by MHSWR Regulation 3.

Important note: The control measures listed are the recommended minimum standard. The site supervisor is responsible for confirming that these, or equally effective measures, are implemented and recorded before work commences.

Hazard Assessment

HAZARDWHO might be harmed and HOWRISK BEFORE CONTROLS: L × S = Score (Rating)CONTROL MEASURESRISK AFTER CONTROLS: L × S = Score (Rating)ACTION BY WHOMBY WHEN
Working at height: Fall from roof, ladder or access platform when cleaning render or roofs.Operatives may suffer major or fatal injuries from falls. Persons below could be struck by falling equipment.5 × 4 = 20 (Very High)1. Avoid: Where possible, clean from ground level using telescopic lances. <br> 2. Prevent (Collective): For higher areas, the primary access method will be a suitable Mobile Elevating Work Platform (MEWP) or a professionally erected tower scaffold with full edge protection. Ensure ground is suitable. <br> 3. Prevent (Personal): If MEWP/scaffold is not reasonably practicable, a detailed justification must be recorded. Ladders for access only, not as a working platform. If work from a ladder is unavoidable and for short duration low risk tasks only, it must be secured and a 3-point contact maintained. <br> 4. Minimise: Establish exclusion zones below the work area using barriers and signs to protect others from falling objects. Secure all tools and hoses. <br> 5. All operatives trained in working at height, and for specific equipment used (e.g. IPAF, PASMA). <br> 6. A specific rescue plan for work at height is in place (see section below).3 × 2 = 6 (Medium)A. SupervisorBefore start
High-pressure water injection: Accidental injection of water into the skin from the jetting lance.Operatives can suffer serious, permanently disabling internal injuries which may not be immediately apparent. Water injection injuries require immediate specialist medical attention.4 × 4 = 16 (Very High)1. Engineering: Use a pressure washer with a safety catch and a trigger that cuts the pressure immediately on release. Inspect hoses, couplings and gun for damage before each use. Never tie down or bypass the trigger. <br> 2. Administrative: Maintain a safe distance from the nozzle (never point it at any person). Post warning signs. Ensure operatives are trained in the specific machine and the severe risk of injection injury. <br> 3. PPE: Wear appropriate PPE including safety boots (BS EN ISO 20345), waterproofs, and impact-resistant eye protection (BS EN 166). Consider specialist water-jetting boots/gaiters.3 × 2 = 6 (Medium)A. SupervisorBefore start
Slips, trips and falls: Slips on wet surfaces, algae, or trip hazards from trailing hoses and equipment.Operatives, site staff and members of the public can suffer fractures, sprains, or head injuries from slips or trips.4 × 3 = 12 (High)1. Administrative: Cordon off the immediate work area using signs and barriers to prevent unauthorised access. <br> 2. Maintain good housekeeping. Route hoses to minimise trip hazards, using ramps or cable covers where they cross walkways. <br> 3. Wash down from high to low points to manage water runoff. Do not allow water to pool or create uncontrolled streams across pedestrian routes. <br> 4. Ensure operatives wear safety footwear with good grip (BS EN ISO 20345).2 × 2 = 4 (Low)A. SupervisorBefore start
Noise: Exposure to high noise levels from the pressure washer engine/pump.Operatives can suffer permanent noise-induced hearing loss or tinnitus from prolonged or repeated exposure.4 × 3 = 12 (High)1. Engineering/Substitute: Position the pressure washer unit as far from the immediate work area as is practical. Use a modern, silenced machine where possible. <br> 2. Administrative: Limit exposure time through job rotation if multiple tasks are ongoing. <br> 3. PPE: Mandatory wearing of hearing protection (ear defenders or plugs, BS EN 352) for anyone operating or working near the pressure washer unit. <br> 4. All operatives to receive training on noise risks and the correct use of hearing protection.2 × 2 = 4 (Low)A. SupervisorBefore start
Asbestos: Accidental disturbance of asbestos containing materials (ACMs) in roof sheets, gutters, or textured coatings on pre-2000 buildings.Operatives and others may inhale asbestos fibres, leading to fatal latent diseases (e.g. mesothelioma, lung cancer).5 × 5 = 25 (Very High)1. ⛔ STOP, CONFIRM AT SITE SURVEY: Before starting, confirm the age of the building and check the site's asbestos register. If no register is available or ACMs are suspected, work must not proceed. <br> 2. High-pressure washing of asbestos cement is prohibited by the Control of Asbestos Regulations 2012 as it can break the surface and release fibres. <br> 3. If ACMs are confirmed or suspected, a specialist licensed contractor must be consulted. Example Contractor Ltd will NOT carry out this work.2 × 1 = 2 (Low)A. SupervisorBefore start
Confined Spaces: Cleaning plant which may include tanks, vessels or pits.Operatives entering or reaching into a confined space could be overcome by hazardous fumes, oxygen deficiency, or drown.5 × 5 = 25 (Very High)1. ⛔ STOP, CONFIRM AT SITE SURVEY: The scope of "plant" to be cleaned must be confirmed. Any work involving entry or reaching into a tank, vessel, pit or other substantially enclosed space is prohibited. <br> 2. A specific safe system of work, risk assessment and emergency rescue arrangements are legal pre-requisites for any confined space entry under the Confined Spaces Regulations 1997. <br> 3. Example Contractor Ltd is not equipped or trained for confined space working. This work will be refused if identified.2 × 1 = 2 (Low)A. SupervisorBefore start
Electricity: Contact with live electrical systems, e.g. external lights, power sockets, or plant controls, due to water ingress.Operatives and others could receive a fatal electric shock or burns. Water ingress could also cause short circuits and fire.4 × 5 = 20 (Very High)1. Eliminate: Identify all external electrical equipment in the work area. Isolate power to these circuits before work begins. Isolation to be confirmed by a competent person. <br> 2. Engineering: Use a Residual Current Device (RCD) for any portable electric tools, including the pressure washer if it is electrically powered. Test the RCD before use. <br> 3. Administrative: Do not spray water directly at electrical fittings, junction boxes, or intake vents. Maintain a safe distance.2 × 2 = 4 (Low)A. SupervisorBefore start
Manual Handling: Lifting and moving the pressure washer, hoses, and barriers.Operatives can suffer musculoskeletal injuries, e.g. back strain or sprains.3 × 2 = 6 (Medium)1. Use mechanical aids (trolley, sack truck) where possible. <br> 2. For team lifts, ensure clear communication. <br> 3. Assess the load, route, and destination before lifting. Use correct lifting technique: keep back straight, bend at the knees. <br> 4. All operatives have received manual handling training.2 × 2 = 4 (Low)OperativesDuring task
Hazardous Substances: Contact with cleaning chemicals, fuel for the washer, or biological hazards (e.g. bird droppings, mould).Operatives can suffer skin irritation, dermatitis, respiratory issues or infection (e.g. psittacosis).3 × 3 = 9 (Medium)1. Substitute: Use the mildest effective, non-hazardous cleaning agent possible. Use water only where feasible. <br> 2. Administrative: Refer to COSHH assessments for all chemical products. Follow safety data sheet (SDS) instructions. Ensure good ventilation. Practise good hygiene, wash hands before eating or drinking. <br> 3. PPE: Wear appropriate gloves (BS EN 374), eye protection (BS EN 166), and RPE if required by the COSHH assessment.2 × 2 = 4 (Low)A. SupervisorBefore start

Hazardous substances used

A full COSHH assessment must be completed for any substance brought to site.

SubstanceWhere usedHazardControlsCOSHH assessment ref.
Diesel / PetrolFuel for pressure washerFlammable, skin irritant, harmful if inhaledStore in approved, labelled container. No smoking/naked flames. Refuel when engine is cool. Use funnel to prevent spills. Wear gloves.COSHH-1 (generate)
Sodium Hypochlorite (if used)Biocidal cleaner for algae/mossCorrosive, causes severe skin burns and eye damage, toxic to aquatic lifeDilute and handle as per SDS. Wear chemical resistant gloves, goggles, and overalls. Prevent runoff into drains.COSHH-2 (generate)
Weils' Disease (Leptospirosis)Contact with water contaminated by rat urineBacterial infection causing flu-like symptoms, can lead to jaundice and kidney failure.Cover all cuts and abrasions with waterproof dressings. Wash hands thoroughly before eating, drinking or smoking.COSHH-3 (generate)

Competence and training

RoleRequired competence (cards, tickets, training)Evidence held
All operativesSite induction; manual handling training; asbestos awareness trainingto be confirmed by Example Contractor Ltd
Operatives working at heightWorking at height training; PASMA for mobile access towers; IPAF (3b) for MEWPs; harness inspection and use training where harnesses are wornto be confirmed by Example Contractor Ltd
All operativesNoise awareness and hearing protection trainingto be confirmed by Example Contractor Ltd
Named first aider (to be confirmed)First Aid at Work (FAW) certificate, in dateto be confirmed by Example Contractor Ltd

Emergency arrangements

Emergency ContactA. Supervisor, 01283 000000
Site AddressUnit 4, Example Trading Estate, Exeter EX2 8XX
Named First Aiderto be confirmed
First Aid Kit LocationIn site vehicle
Nearest HospitalRoyal Devon and Exeter Hospital, Exeter, confirm before start on site

Rescue plan

A rescue plan is required as this work involves working at height. The plan must be briefed to all operatives before work starts.

Rescuer role: The second operative on site will act as the rescuer. Both operatives must be familiar with the plan.

Rescue equipment: The following will be kept immediately available at the work position:

  • Fully charged mobile phone for emergency calls.
  • MEWP ground controls (for rescue from MEWP basket).
  • Rescue kit for retrieval if fall arrest harnesses are used (justification for harness use must be exceptional).

Rescue method (from MEWP):

  1. The second operative will immediately assess the situation from the ground.
  2. If the person in the basket is incapacitated, the rescuer will operate the ground controls to lower the MEWP basket to a safe level.
  3. Access the casualty and provide first aid.
  4. Call emergency services if required.

Rescue method (using fall arrest harness - exceptional use only):

  1. Rescue must be immediate. Suspension in a harness can be fatal in minutes.
  2. The rescuer will use the pre-briefed rescue kit and procedure to lower the casualty to the ground. Self-rescue using installed systems is not planned.
  3. Do not attempt a rescue that puts the rescuer at unacceptable risk.

Suspension trauma note: A person suspended in a harness can lose consciousness within minutes. Rescue must be rapid. When calling the ambulance service, state that the casualty has been suspended in a fall arrest harness.

Emergency services call sequence:

  1. One operative dials 999.
  2. State: "Ambulance/Fire Service required for a fall from height" (or other incident).
  3. Give the address: Unit 4, Example Trading Estate, Exeter EX2 8XX.
  4. Give the nature of the injuries.
  5. The second operative will meet the ambulance at the trading estate entrance and direct them to the scene.
  6. Inform A. Supervisor immediately.

Significant findings summary

The main risks identified are falls from height, high-pressure water injection injuries, and slips on wet surfaces. The potential for encountering asbestos, live electrical services and confined spaces requires strict pre-work checks and prohibition of work if found. Control measures rely on using appropriate access equipment (MEWP/tower), safe equipment handling, clear demarcation of work areas, and isolation of services. A robust rescue plan must be in place for any work at height.

Risk Matrix Key

LikelihoodSeverity
1Very unlikely1Insignificant
2Unlikely2Minor
3Possible3Moderate
4Likely4Major
5Very likely5Catastrophic
RatingScoreAction Required
Low1-4Acceptable, manage by routine procedures
Medium5-9Adequate controls required, monitor and review
High10-15Significant controls required, senior management attention
Very High16-25Unacceptable, stop work, implement additional controls immediately

Review

This risk assessment will be reviewed on or before 14 October 2027, or sooner if there is any significant change to the work activity, equipment used, location, legislation, or following an incident.

Declaration and Sign-off

I, the undersigned supervisor, confirm that I have read and understood this risk assessment. I confirm that the control measures have been put in place and that the work will be carried out in accordance with these findings. I have briefed all operatives on the content of this assessment and the associated rescue plan.

NameRoleSignatureDate
A. SupervisorSupervisor
Operative
Operative

What a compliant Risk Assessment must contain

  • Hazards specific to the actual task, site and materials
  • Who might be harmed and how, for each hazard
  • The controls already in place PLUS any further action needed
  • A before/after risk score and a review date

Why a Risk Assessment for pressure-washing operative gets rejected

  • Copied from a generic example instead of written for the actual task
  • Controls that don't match what the business actually does
  • No record of who does the further actions, or by when
  • An auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'

Already have one? Check it against the standard, free.

Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.

Pressure Washing & Jet Washing hazards it must cover

Pressure-washing operative, meaning cleaning driveways, render, roofs, plant and commercial premises with high-pressure water, brings hazards a Risk Assessment has to address:

  • high-pressure injection injuries
  • slips on wet and algae-covered surfaces
  • working at height on roofs and render
  • chemical exposure from cleaning agents and biocides
  • noise from petrol machines

Generate your Risk Assessment in minutes

Built to the correct published standard for pressure-washing operative: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your Risk Assessment

FAQ

Do you need a Risk Assessment for pressure-washing operative?

A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For pressure-washing operative, meaning cleaning driveways, render, roofs, plant and commercial premises with high-pressure water, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the 5-step method (INDG163).

What must a Risk Assessment for pressure-washing operative contain?

At minimum: hazards specific to the actual task, site and materials; who might be harmed and how, for each hazard; the controls already in place PLUS any further action needed; A before/after risk score and a review date.

Why does a Risk Assessment for pressure-washing operative get rejected?

The usual reasons: copied from a generic example instead of written for the actual task; controls that don't match what the business actually does; no record of who does the further actions, or by when; an auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'.

Which regulation is a Risk Assessment for pressure-washing operative written under?

MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.

How fast can I get a Risk Assessment?

A couple of minutes. Describe the job, and RAMSReady writes a Risk Assessment for your exact pressure-washing operative live against the correct standard, with a review date and a sign-off/records section.

Not writing this one today?

We will email you a one page overview of what RAMSReady covers, so you have it when you need it.

Want to see how it would work for your firm?

Tell us roughly what you run and who keeps your records, and we will come back to you.

Related guides

Other documents for Pressure Washing & Jet Washing

Similar work

Templates and tools