RAMS · Locksmiths

RAMS for Locksmiths

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a locksmith's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a locksmith's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Locksmiths hazards it must cover

Typical locksmith work, meaning Fitting, replacing, rekeying and repairing locks, access control hardware and door furniture on residential, commercial and vehicle premises across the UK., brings hazards a RAMS has to address:

  • Manual handling of heavy door sets and safe units
  • Hand tool injuries from picks, drills and chisels during forced entry
  • Noise and vibration from angle grinders and hammer drills (HAVs exposure)
  • Asbestos in pre-2000 fabric disturbed when drilling into walls or door frames
  • Working alone in unsecured or unfamiliar premises
  • Contact with contaminated needles or sharps in residential lock changes

Generate your RAMS in minutes

Built to the correct published standard for a locksmith: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do locksmiths legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For locksmith work, meaning Fitting, replacing, rekeying and repairing locks, access control hardware and door furniture on residential, commercial and vehicle premises across the UK., it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a locksmith's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact locksmith job live against the correct standard, with a review date and a sign-off/records section.

Related guides