RAMS · EV Charger Installers

RAMS for EV Charger Installers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a EV charger installer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a EV charger installer's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

EV Charger Installers hazards it must cover

Typical EV charger installer work, meaning domestic and commercial EV charge-point installation, supply upgrades and earthing arrangements, brings hazards a RAMS has to address:

  • electric shock during supply connection and consumer-unit work
  • open PEN conductor faults and earthing (BS 7671 722)
  • drilling into walls with hidden services
  • working in car parks with moving vehicles
  • manual handling of pedestal units

Generate your RAMS in minutes

Built to the correct published standard for a EV charger installer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do ev charger installers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For EV charger installer work, meaning domestic and commercial EV charge-point installation, supply upgrades and earthing arrangements, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a EV charger installer's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact EV charger installer job live against the correct standard, with a review date and a sign-off/records section.