RAMS · Ductwork Installers
RAMS for Ductwork Installers
A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a ductwork installer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
What a compliant RAMS must contain
- A hazard table with a likelihood × severity score before and after controls
- Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
- A numbered, step-by-step method statement for the actual task
- PPE to BS EN standards, emergency arrangements, and an operative sign-off
Why a ductwork installer's RAMS gets rejected
- Residual risk dropped from high to low on PPE or 'competent operatives' alone
- Generic hazards that could apply to any job
- No method statement, or one too vague to follow on site
- The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')
Already have one? Check it against the standard, free.
Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.
Check yours freeDuctwork Installers hazards it must cover
Typical ductwork installer work, meaning ventilation ductwork, kitchen extract, AHUs and fire dampers in commercial buildings, brings hazards a RAMS has to address:
- working at height on towers and MEWPs with heavy sections
- cuts from sheet-metal edges
- manual handling of long duct runs
- hot works when cutting and sealing
- grease and fire risk on kitchen extract systems
Generate your RAMS in minutes
Built to the correct published standard for a ductwork installer: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your RAMSFAQ
Do ductwork installers legally need a RAMS?
A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For ductwork installer work, meaning ventilation ductwork, kitchen extract, AHUs and fire dampers in commercial buildings, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.
What makes a ductwork installer's RAMS fail?
The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.
How fast can I get a RAMS?
A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact ductwork installer job live against the correct standard, with a review date and a sign-off/records section.