RAMS for Tilers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a tiler's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a tiler's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Tilers hazards it must cover

Typical tiler work, meaning wall and floor tiling, wet-room tanking, screeding and grouting, brings hazards a RAMS has to address:

  • silica dust from cutting tiles (RCS, a carcinogen)
  • cement dermatitis and burns from adhesives and grout
  • kneeling and repetitive strain
  • noise and vibration from cutters and grinders
  • slips on wet floors and spilt adhesive

Generate your RAMS in minutes

Built to the correct published standard for a tiler: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do tilers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For tiler work, meaning wall and floor tiling, wet-room tanking, screeding and grouting, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a tiler's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.