Method Statement · Roofers
Method Statement for Roofers
A safe system of work — the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. Below: what a roofer’s Method Statement must contain, why they get rejected, and the hazards it has to cover — or generate one for your exact job in a couple of minutes.
What a compliant Method Statement must contain
- A numbered sequence from set-up to clean-down
- The specific plant, equipment and isolation points named at each step
- Measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s)
- Competence requirements and PPE
Why a roofer’s Method Statement gets rejected
- Abstract steps ('isolate and verify') with nothing measurable
- A likelihood × severity scoring table bolted on (that belongs in the risk assessment)
- Steps that skip the actual sequence a job really follows
- No named competent person where the law requires one
Already have one? Check it against the standard — free.
Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.
Check yours freeRoofers hazards it must cover
Typical roofer work — re-roofing, repairs, flat-roof and industrial cladding work — brings hazards a Method Statement has to address:
- falls from height and through fragile roofs (WAH 2005)
- manual handling of materials
- hot works and bitumen burns
- weather and wind exposure
Generate your Method Statement in minutes
Built to the correct published standard for a roofer — specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Method StatementFAQ
Do roofers legally need a Method Statement?
A safe system of work — the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For roofer work — re-roofing, repairs, flat-roof and industrial cladding work — it is the document a client, principal contractor or inspector expects to see, grounded in the recognised safe-system-of-work format (HSE guidance).
What makes a roofer's Method Statement fail?
The usual reasons: Abstract steps ('isolate and verify') with nothing measurable; A likelihood × severity scoring table bolted on (that belongs in the risk assessment); Steps that skip the actual sequence a job really follows. RAMSReady generates one to the correct published form and avoids these.
How fast can I get a Method Statement?
A couple of minutes. Describe the job, and RAMSReady writes a roofer-specific Method Statement live against the correct standard — with a review date and a sign-off/records section.