Method Statement · Roofers

Method Statement for Roofers

A safe system of work — the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. Below: what a roofer’s Method Statement must contain, why they get rejected, and the hazards it has to cover — or generate one for your exact job in a couple of minutes.

What a compliant Method Statement must contain

  • A numbered sequence from set-up to clean-down
  • The specific plant, equipment and isolation points named at each step
  • Measurable checks where a step proves safety (e.g. prove dead, hold zero-pressure 30s)
  • Competence requirements and PPE

Why a roofer’s Method Statement gets rejected

  • Abstract steps ('isolate and verify') with nothing measurable
  • A likelihood × severity scoring table bolted on (that belongs in the risk assessment)
  • Steps that skip the actual sequence a job really follows
  • No named competent person where the law requires one

Already have one? Check it against the standard — free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Roofers hazards it must cover

Typical roofer work — re-roofing, repairs, flat-roof and industrial cladding work — brings hazards a Method Statement has to address:

  • falls from height and through fragile roofs (WAH 2005)
  • manual handling of materials
  • hot works and bitumen burns
  • weather and wind exposure

Generate your Method Statement in minutes

Built to the correct published standard for a roofer — specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your Method Statement

FAQ

Do roofers legally need a Method Statement?

A safe system of work — the numbered, step-by-step sequence for carrying out the task safely, that an operative can actually follow. For roofer work — re-roofing, repairs, flat-roof and industrial cladding work — it is the document a client, principal contractor or inspector expects to see, grounded in the recognised safe-system-of-work format (HSE guidance).

What makes a roofer's Method Statement fail?

The usual reasons: Abstract steps ('isolate and verify') with nothing measurable; A likelihood × severity scoring table bolted on (that belongs in the risk assessment); Steps that skip the actual sequence a job really follows. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a Method Statement?

A couple of minutes. Describe the job, and RAMSReady writes a roofer-specific Method Statement live against the correct standard — with a review date and a sign-off/records section.