COSHH Assessment · Insulation Installers

COSHH Assessment for Insulation Installers

A COSHH assessment of the hazardous substances used or created, built from the product's Safety Data Sheet (COSHH 2002). For insulation installer work, it has to cover falls through ceilings from loft joists. It must include each substance with its hazard statements and CAS number from the SDS.

A COSHH assessment of the hazardous substances used or created, built from the product's Safety Data Sheet (COSHH 2002). Below: what a insulation installer's COSHH Assessment must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

A finished example

Example COSHH Assessment from a similar trade (Painters & Decorators)

We do not have a finished COSHH Assessment for insulation installers yet, so this one is from painters & decorators: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.

The job it was written for: “Substances used and created during surface prep, spraying and decorating interior and exterior. Commercial unit, occupied during working hours, 3 operatives, 1 day. Main risks: solvents, isocyanate paints and dust; working at height on steps and towers; old lead paint on pre-1980 surfaces.”. Names and contact details are anonymised.

EXAMPLE

COSHH Assessment, Example Painter & Decorator Ltd

CompanyExample Painter & Decorator Ltd
Site AddressUnit 4, Example Trading Estate, Exeter EX2 8XX
Job DescriptionSurface preparation, spray painting and brush/roller decorating of interior and exterior surfaces of a commercial unit.
AssessorA. Supervisor
Date14 October 2026
VersionV1.0
Review Date14 October 2027

This document is an assessment of the risks from substances hazardous to health, as required by the Control of Substances Hazardous to Health Regulations 2002 (COSHH). It identifies the necessary controls to prevent or adequately control exposure. The specified controls must be implemented before work starts.

1. Substances Assessed

The specific products used on site must be identified and their Safety Data Sheets (SDS) obtained. The table below is representative; the supervisor must update it with the actual products in use.

Product / SupplierFormHazard Classification & Key H-Statements (from SDS §2)Hazardous Ingredient(s) & CAS No. (from SDS §3)Workplace Exposure Limit (WEL) (from EH40/2005)
Two-pack Isocyanate-based paint (e.g. PU floor paint)Liquid, Vapour, Aerosol (when sprayed)DANGER. H315 (skin irritation), H317 (allergic skin reaction), H319 (serious eye irritation), H332 (harmful if inhaled), H334 (may cause allergy or asthma symptoms), H335 (respiratory irritation), H351 (suspected of causing cancer).Hexamethylene di-isocyanate (HDI), CAS 822-06-0HDI: Long-term (8-hr TWA): 0.02 mg/m³. Short-term (15-min STEL): 0.07 mg/m³. Skin/Respiratory Sensitiser.
Solvent-based gloss paint (e.g. oil-based)Liquid, VapourWARNING. H226 (flammable liquid/vapour), H336 (drowsiness/dizziness), H411 (toxic to aquatic life with long lasting effects).Hydrocarbons, C9-C11, n-alkanes, isoalkanes, cyclics, < 2% aromatics.Long-term (8-hr TWA): 1200 mg/m³
Paint Stripper / Solvent CleanerLiquid, VapourDANGER. H225 (highly flammable), H319 (serious eye irritation), H336 (drowsiness/dizziness), H361d (suspected of damaging unborn child), H373 (may cause damage to organs).Toluene, CAS 108-88-3. Acetone, CAS 67-64-1.Toluene: Long-term (8-hr TWA): 191 mg/m³. Short-term (15-min STEL): 384 mg/m³. Acetone: Long-term (8-hr TWA): 1210 mg/m³. Short-term (15-min STEL): 3620 mg/m³.
Water-based emulsion paintLiquidNone classified as hazardous. Low-risk product.Contains preservatives which may cause sensitisation in some individuals.No WEL assigned. Control to As Low As Reasonably Practicable (ALARP).

2. Process-Generated Substances

These are substances created or disturbed by the work process itself.

SubstanceProcess Creating SubstanceHazard Classification & Key H-StatementsHazardous Ingredient(s)Workplace Exposure Limit (WEL) (from EH40/2005)
Dust from preparation (wood, plaster etc)Sanding, cutting or abrading surfaces.WARNING. General dust can cause respiratory irritation. Wood dust may cause asthma.Softwood/hardwood dust. Plaster dust (gypsum).Hardwood dust: 3 mg/m³ (8-hr TWA). Softwood dust: 5 mg/m³ (8-hr TWA). General inhalable dust: 10 mg/m³ (8-hr TWA).
Lead-containing dust (from pre-1980 paintwork)Sanding, scraping or heat-stripping old paint surfaces.DANGER. H360 (may damage fertility/unborn child), H372 (causes damage to organs through prolonged exposure), H410 (very toxic to aquatic life).Lead and its compounds.Lead: 0.15 mg/m³ (8-hr TWA).
Respirable Crystalline Silica (RCS) dustSanding or abrading concrete, mortar, brick or render.DANGER. H350 (may cause cancer via inhalation), H372 (causes damage to lungs through prolonged or repeated exposure - Silicosis).Crystalline Silica (quartz).Respirable Crystalline Silica: 0.1 mg/m³ (8-hr TWA).
⛔ Asbestos FibresDisturbing building materials in a pre-2000 property.DANGER. H334 (allergy/asthma symptoms), H350 (may cause cancer), H372 (damage to lungs through prolonged exposure).All forms of asbestos.All forms: 0.1 fibres/cm³ (4-hour TWA) and 0.6 fibres/cm³ (10-minute TWA).

Actions Required before work starts:

ActionCompleted, date & initials
⛔ STOP, CONFIRM AT SITE SURVEY: The building is pre-2000. Under the Control of Asbestos Regulations 2012, duty holders must provide an asbestos register. You must obtain and review the asbestos register for Unit 4 BEFORE any surface preparation work starts. Confirm no asbestos-containing materials (ACMs) will be disturbed. If ACMs are present or suspected, and no register is available, work that may disturb them must not proceed. A licensed contractor may be required.
Obtain the Safety Data Sheet (SDS) for every paint, solvent, filler and other chemical product to be used on site. Ensure this assessment is updated with the specific product information.
Confirm the age and composition of existing paintwork. If pre-1980, assume lead is present. Prohibit dry sanding or heat stripping of lead-based paint.

3. Who is Exposed & How?

GroupExposure RoutesFrequency and Duration
Decorators (3 operatives)Inhalation: Vapours from solvents, aerosolised paint spray (isocyanates), dust from surface preparation (lead, wood, silica). Skin Contact/Absorption: Direct contact with paints, solvents, thinners causing dermatitis or absorption of harmful substances. Ingestion: Accidental swallowing via contaminated hands.Intermittent exposure over a period of 1 working day. Peak exposure during spraying, mixing, and sanding activities in enclosed spaces.
Other site users / Client staffInhalation: Vapours and dust migrating from the immediate work area.Low, unless they enter the cordoned-off work area during high-exposure tasks like spraying.

4. Risk Evaluation

  • High Risk: Inhalation of isocyanate paint spray. Isocyanates are potent respiratory sensitisers and a leading cause of occupational asthma. Any exposure must be strictly controlled.
  • High Risk: Inhalation of dust from sanding lead-based paint. Lead is highly toxic and can cause irreversible neurological damage.
  • Medium Risk: Inhalation of solvent vapours in poorly ventilated areas, leading to dizziness, headaches, and long-term organ damage.
  • Medium Risk: Skin contact with solvents and isocyanates, leading to dermatitis and sensitisation.
  • Low Risk: Exposure to water-based paints, provided good hygiene and ventilation are maintained.

5. Control Measures

Controls must be applied in the following strict hierarchy, as required by COSHH Regulation 7. Personal Protective Equipment (PPE) is a last resort and must be used in addition to other controls.

Control Hierarchy (COSHH Reg 7)Required Control Measures for this ProjectCompleted, date & initials
(a) Prevention / Elimination / SubstitutionUse water-based, low-solvent paints wherever technically possible. Use dust-free sanding methods, such as wet-sanding or sanding equipment with on-tool extraction, especially on suspected lead paint. Avoid spray application of isocyanate paints where brush/roller application is feasible. Prohibit eating, drinking, and smoking in the work area.
(b) Engineering Controls / Control at SourceVentilation: Ensure good general ventilation in all work areas by opening windows and doors. For interior spraying or significant solvent use, use mechanical extraction fans to create through-draught, venting to a safe place outside. Extraction: Where sanding cannot be done wet, use M-Class or H-Class vacuum extraction attached directly to the sanding tool (on-tool extraction). This is mandatory for RCS and lead dust.
(c) Organisational / Administrative ControlsCordon off the work area with signs to prevent entry by unauthorised persons, especially during spraying. Rotate staff to minimise the duration of exposure for any single individual. Enforce strict personal hygiene procedures, particularly washing hands before breaks and after work. Isolate local electrical circuits before preparing surfaces around sockets and switches.
(d) Respiratory & Personal Protective Equipment (RPE/PPE) (Last resort)RPE for Spraying Isocyanates: Air-fed breathing apparatus (must be face-fit tested) is required. RPE for Solvents/Dust: A-rated organic vapour filter and P3 particulate filter combined respirator (e.g. A2P3) for solvent paint application and dust-generating tasks (must be face-fit tested). Gloves: Chemical-resistant nitrile gloves (confirm suitability against SDS §8). Eye Protection: Safety glasses (BS EN 166) or goggles for mixing and applying. Coveralls: Disposable coveralls to prevent skin contamination.

6. Exposure vs WEL

With the controls above implemented, exposure levels for all substances are expected to be controlled to below their Workplace Exposure Limits (WEL). For asthmagens, sensitisers and carcinogens (isocyanates, lead, RCS), exposure must be reduced to as low as is reasonably practicable, as any exposure carries a risk.

7. First Aid

First aid provisions are taken from the relevant product SDS and must be available on site.

  • Inhalation: Move the person to fresh air and keep them comfortable for breathing. If they feel unwell, or in case of isocyanate exposure, seek immediate medical attention.
  • Skin Contact: Remove contaminated clothing. Wash skin thoroughly with soap and water. Do not use solvents. If skin irritation or a rash occurs, get medical advice.
  • Eye Contact: Rinse cautiously with water for several minutes. Remove contact lenses if present and easy to do. Continue rinsing. Get medical attention.
  • Ingestion: Do NOT induce vomiting. Rinse mouth. Seek immediate medical advice.

8. Spillage & Accidental Release

  • Minor Spills: Ventilate the area. Contain and absorb spill with non-combustible material e.g. sand, earth, or vermiculite. Collect and place in a suitable container for disposal.
  • Major Spills: Evacuate the area. Prevent entry. Ventilate. Wear appropriate RPE/PPE. Contain spill as above. Prevent entry into drains or watercourses.

A suitable spill kit containing absorbent granules, pads, and disposal bags must be available on site.

9. Handling, Storage & Disposal

  • Handling: Avoid skin and eye contact and inhalation of vapours/dust. Ensure all containers are correctly labelled. Decant only in well-ventilated areas.
  • Storage: Store all substances in their original, tightly-closed containers in a cool, dry, well-ventilated area away from sources of ignition and incompatible materials.
  • Disposal: All waste materials, including contaminated rags and empty containers, must be disposed of as hazardous/special waste in accordance with local authority and environmental regulations. Do not pour leftover paint or solvent down drains.

10. Health Surveillance

Health surveillance under the guidance of an occupational health professional is required by COSHH Regulation 11 for operatives regularly exposed to isocyanates (annual lung function tests and questionnaires).

11. Information, Instruction & Training

All operatives must be trained on:

  • The hazards and risks of the substances they use.
  • The control measures detailed in this assessment and how to use them correctly (including RPE face-fit testing).
  • What to do in an emergency, including spill response.
  • The findings of this COSHH assessment and be provided with access to the Safety Data Sheets.

12. Review

This assessment must be reviewed by 14 October 2027, or sooner if:

  • There is a significant change in the work process or substances used.
  • It is suspected that the control measures are no longer effective.
  • An incident occurs related to exposure.

Site Team Sign-off and Declaration

I confirm that I have read and understood the requirements of this COSHH Assessment. I will implement the specified control measures and ensure work is carried out in accordance with its findings.

NameRoleSignatureDate
A. SupervisorSupervisor
Operative
Operative
Operative

What a compliant COSHH Assessment must contain

  • Each substance with its hazard statements and CAS number from the SDS
  • The Workplace Exposure Limit (EH40) where one exists, never invented
  • Controls in order of effectiveness, LEV and ventilation before RPE (COSHH 2002)
  • Process-generated substances screened (dust, fume, silica)

Why a insulation installer's COSHH Assessment gets rejected

  • Generic solvent boilerplate instead of the actual SDS hazards
  • A Workplace Exposure Limit fabricated for a substance that has none
  • Exposure risk credited mainly to gloves/masks (RPE is the LAST resort)
  • Process dust/fume (wood dust, welding fume, RCS) not assessed

Already have one? Check it against the standard, free.

Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.

Insulation Installers hazards it must cover

Typical insulation installer work, meaning loft, cavity wall, external wall and spray-foam insulation, brings hazards a COSHH Assessment has to address:

  • falls through ceilings from loft joists
  • fibre and dust inhalation from mineral wool
  • isocyanate exposure from spray foam (asthma)
  • heat stress in lofts
  • asbestos in older loft and wall materials

Generate your COSHH Assessment in minutes

Built to the correct published standard for a insulation installer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your COSHH Assessment

FAQ

Do insulation installers legally need a COSHH Assessment?

A COSHH assessment of the hazardous substances used or created, built from the product's Safety Data Sheet (COSHH 2002). For insulation installer work, meaning loft, cavity wall, external wall and spray-foam insulation, it is the document a client, principal contractor or inspector expects to see, grounded in COSHH 2002 reg 6/7 (HSE), built from the product Safety Data Sheet.

What must an insulation installer's COSHH Assessment contain?

At minimum: each substance with its hazard statements and CAS number from the SDS; the Workplace Exposure Limit (EH40) where one exists, never invented; controls in order of effectiveness, LEV and ventilation before RPE (COSHH 2002); process-generated substances screened (dust, fume, silica).

Why does an insulation installer's COSHH Assessment get rejected?

The usual reasons: generic solvent boilerplate instead of the actual SDS hazards; A Workplace Exposure Limit fabricated for a substance that has none; exposure risk credited mainly to gloves/masks (RPE is the LAST resort); process dust/fume (wood dust, welding fume, RCS) not assessed.

Which regulation is an insulation installer's COSHH Assessment written under?

COSHH 2002. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/2002/2677/contents.

How fast can I get a COSHH Assessment?

A couple of minutes. Describe the job, and RAMSReady writes a COSHH Assessment for your exact insulation installer job live against the correct standard, with a review date and a sign-off/records section.

Not writing this one today?

We will email you a one page overview of what RAMSReady covers, so you have it when you need it.

Want to see how it would work for your firm?

Tell us roughly what you run and who keeps your records, and we will come back to you.

Related guides

Other documents for Insulation Installers

Similar trades

Templates and tools