Risk Assessment · Glaziers
Risk Assessment for Glaziers
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For glazier work, it has to cover manual handling of large glass units (cuts, crush, dropped loads). It must include hazards specific to the actual task, site and materials.
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. Below: what a glazier's Risk Assessment must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
A finished example
Example Risk Assessment from a similar trade (Fire Alarm Engineers)
We do not have a finished Risk Assessment for glaziers yet, so this one is from fire alarm engineers: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.
The job it was written for: “Job: install, commission, inspect and maintain fire detection and alarm systems in commercial and residential buildings, including cable runs, detectors, call points, control panels and sounder circuits. Commercial unit, occupied during working hours, 3 operatives, 2 days. Main risks: Working at height on ladders and mobile elevated work platforms; Drilling and chasing masonry generating silica dust; Live electrical conductors during installation and fault-finding.”. Names and contact details are anonymised.
Risk Assessment, Fire Alarm System Installation & Maintenance
Document title: Risk Assessment, Fire Alarm System Works
Company: Example Fire Alarm Engineer Ltd
Author: A. Supervisor
Date: 14 October 2026
Version: V1.0
Review date: 14 October 2027
Company details
| Field | Detail |
|---|---|
| Company name | Example Fire Alarm Engineer Ltd |
| Address | to be confirmed |
| Registration number | to be confirmed |
| Phone | to be confirmed |
| Named supervisor | A. Supervisor |
| Insurance valid until | to be confirmed |
Task / activity & location
Activity: Installation, commissioning, inspection and maintenance of fire detection and alarm systems. This includes running cables, fitting detectors, call points, control panels and sounder circuits. Work involves use of ladders, Mobile Elevated Work Platforms (MEWPs), and power tools for drilling and chasing masonry.
Location: Unit 4, Example Trading Estate, Exeter EX2 8XX. This is an occupied commercial unit.
Legal basis: This assessment is conducted in accordance with the Management of Health and Safety at Work Regulations 1999, Regulation 3. It records the significant findings of the assessment.
Hazard assessment table
| HAZARD | WHO might be harmed and HOW | RISK BEFORE CONTROLS: L × S = Score | CONTROL MEASURES | RISK AFTER CONTROLS: L × S = Score | ACTION BY WHOM | BY WHEN |
|---|---|---|---|---|---|---|
| Electric shock and burns from contact with live electrical circuits | Engineers installing or fault-finding on control panels, sounder circuits and mains supplies. Harm includes electric shock, burns, and death by electrocution. Other site users could be harmed by exposed live parts. | 4 × 5 = 20 (Very High) | Safe isolation is the default procedure. Live working is prohibited unless it meets the strict criteria of the Electricity at Work Regulations 1989, reg 14. <br>1. Isolate: Before work, identify and isolate the relevant circuits at the distribution board. Lock off with a unique key and place warning tags. <br>2. Prove dead: Use a GS38-compliant voltage tester and proving unit to verify the circuit is dead before and after testing. <br>3. Any essential testing on live circuits to be conducted by a competent electrician using insulated tools, appropriate PPE (e.g. insulated gloves) and test probes with fused leads. <br>4. Power tools to be 110V supplied via a transformer and RCD, or cordless. Visually inspect all tools and leads before use. | 2 × 2 = 4 (Low) | A. Supervisor | Before start |
| Falls from height while using ladders or MEWPs | Engineers installing detectors, cables and sounders at ceiling level. Harm includes major injuries or fatality from a fall. Persons below could be struck by falling tools or materials. | 4 × 4 = 16 (Very High) | 1. Use MEWPs (e.g. scissor lift) in preference to ladders for duration work. MEWP operators must be IPAF trained. Conduct pre-use checks. Cordon off the area below with signs and barriers. <br>2. Ladders for short-duration, light-duty work only. Ladders must be industrial grade, in good condition, and inspected before use. Maintain 3 points of contact. Do not overreach. <br>3. Ensure ground is firm and level for all access equipment. <br>4. Tools to be kept in bags or on lanyards to prevent them falling. | 2 × 3 = 6 (Medium) | A. Supervisor | Before start |
| Exposure to asbestos fibres during intrusive work | Engineers drilling or chasing into walls, ceilings or other building fabric that may contain Asbestos Containing Materials (ACMs). Harm includes fatal lung diseases (e.g. mesothelioma) which may develop years after exposure. | 4 × 5 = 20 (Very High) | ⛔ STOP, CONFIRM AT SITE SURVEY: <br>1. Obtain the site's asbestos register/survey before any intrusive work begins. <br>2. No drilling, cutting or disturbance of any material is permitted until the survey confirms it is free of asbestos. <br>3. If no survey exists, or if suspected ACMs are found that are not on the register, work must stop immediately. The area must be secured and the client informed. The material must be sampled and analysed by a UKAS accredited laboratory before work can resume. <br>4. All operatives must hold current Asbestos Awareness (Category A) training. | 1 × 2 = 2 (Low) | A. Supervisor | Before start |
| Inhalation of respirable crystalline silica (RCS) dust | Engineers drilling or chasing into masonry (concrete, brick, mortar). Harm includes silicosis, lung cancer and other serious respiratory diseases. Other site users may also be exposed to dust clouds. | 4 × 4 = 16 (Very High) | 1. Engineering controls: Use a power tool with on-tool extraction (HEPA filtered H or M-class vacuum). <br>2. Water suppression: Use water to damp down the cutting/drilling area where practicable. <br>3. Respiratory Protective Equipment (RPE): Wear a face-fitted FFP3 disposable mask or half-mask respirator with P3 filters. <br>4. Clear the area of non-essential personnel and use screening to contain dust. <br>5. Good housekeeping: vacuum dust, do not dry sweep. | 2 × 2 = 4 (Low) | A. Supervisor | Before start |
| Manual handling injuries | Engineers lifting and carrying fire alarm panels, cable drums, toolboxes or access equipment. Harm includes musculoskeletal injuries such as sprains, strains, and back injuries. | 3 × 3 = 9 (Medium) | 1. Assess the load. If heavy or awkward, use a mechanical aid (e.g. trolley, sack barrow) or get help from another person (team lift). <br>2. Break down loads where possible (e.g. use shorter cable runs). <br>3. Adopt correct lifting technique: feet stable, straight back, bend knees, keep load close to the body. <br>4. Ensure routes are clear of obstructions before moving items. | 2 × 2 = 4 (Low) | Operatives | During work |
| Slips, trips and falls on the same level | All personnel moving around the site. Harm includes fractures, sprains, and impact injuries. The site is occupied, so other users are also at risk. | 3 × 3 = 9 (Medium) | 1. Maintain good housekeeping. Keep work areas tidy and free from trailing cables, packaging and waste materials. <br>2. Route cables away from walkways or use cable ramps/covers. <br>3. Clean up any spills immediately. <br>4. Ensure adequate lighting in all work areas. Wear safety footwear with non-slip soles. | 2 × 2 = 4 (Low) | Operatives | During work |
| Excessive noise exposure from power tools | Engineers using drills and grinders. Harm includes noise-induced hearing loss and tinnitus. | 3 × 3 = 9 (Medium) | 1. Use modern, well-maintained tools to minimise noise output. <br>2. Limit duration of exposure to noisy tasks. <br>3. Wear suitable hearing protection (e.g. ear defenders or plugs rated to BS EN 352) when using power tools for drilling masonry. <br>4. Post warning signs if work creates a significant noise hazard for others in the vicinity. | 2 × 2 = 4 (Low) | Operatives | During work |
Hazardous substances used
This work involves the use or generation of the following hazardous substances, which are subject to assessment under the Control of Substances Hazardous to Health Regulations 2002.
| Substance | Where used | Hazard | Controls | COSHH assessment ref. |
|---|---|---|---|---|
| Respirable Crystalline Silica (RCS) dust | Generated when drilling/chasing masonry. | Carcinogen, causes silicosis. | On-tool extraction, RPE (FFP3). | COSHH-1 (generate) |
| Asbestos fibres | Potential for release if pre-2000 building fabric is disturbed. | Carcinogen, causes asbestosis, mesothelioma. | Stop work, check asbestos register. | COSHH-2 (generate) |
Competence and training
| Role | Required competence (cards, tickets, training) | Evidence held |
|---|---|---|
| All operatives | CSCS card (or equivalent trade scheme); site induction; manual handling training | to be confirmed by Example Fire Alarm Engineer Ltd |
| Operatives working at height | Working at height training; IPAF (3a/3b) for MEWPs; ladder safety training | to be confirmed by Example Fire Alarm Engineer Ltd |
| All operatives | Asbestos awareness (Category A) training, refreshed every 12 months | to be confirmed by Example Fire Alarm Engineer Ltd |
| Electricians | 18th Edition (BS 7671) qualification; ECS card; safe isolation training | to be confirmed by Example Fire Alarm Engineer Ltd |
| Named first aider (to be confirmed) | First Aid at Work (FAW) certificate, in date | to be confirmed by Example Fire Alarm Engineer Ltd |
Emergency arrangements
| Item | Detail |
|---|---|
| Site first aider | to be confirmed |
| First aid kit location | In company vehicle |
| Emergency contact | A. Supervisor, 01283 000000 |
| Nearest A&E hospital | Royal Devon and Exeter Hospital, Exeter (confirm before start on site) |
| In case of fire | Activate nearest call point, evacuate to designated assembly point, call 999. |
Rescue plan
A rescue plan is required for all work at height.
Named rescuer role: A competent colleague on site will act as rescuer. All operatives must be familiar with rescue procedures.
Rescue equipment: The following will be available at the work position:
- Mobile phone for emergency calls.
- For MEWP work: MEWP ground controls.
Rescue method (from MEWP):
- In the event of an operative becoming ill, incapacitated, or the platform failing, the second operative on the ground will initiate the rescue.
- The area below the MEWP will be cleared of all personnel and hazards.
- The rescuer will operate the MEWP ground controls to lower the basket safely to the ground.
- First aid will be administered as required, and emergency services will be called if necessary.
Emergency services call sequence:
- Who dials 999: The designated rescuer or supervisor (A. Supervisor).
- What they say: "Ambulance/Fire service required at Unit 4, Example Trading Estate, Exeter EX2 8XX. A person has fallen from height / is incapacitated in a MEWP." Provide details of injuries and confirm access point.
- Who meets ambulance: A designated person will meet the emergency services at the site entrance and direct them to the incident location.
- Who informs supervisor: If not already aware, A. Supervisor must be informed immediately.
Significant findings summary
- A primary risk is contact with live electricity. Safe isolation procedures in accordance with the Electricity at Work Regulations 1989 are mandatory and must be followed for all work on electrical circuits.
- Work at height is required. The hierarchy of control must be followed, prioritising MEWPs over ladders. A rescue plan is in place.
- Intrusive work into the building fabric presents a risk of exposure to asbestos and silica dust. The site asbestos register must be consulted before any work starts, and dust must be controlled at source using extraction and RPE.
- The site is occupied, requiring clear segregation of work areas and good housekeeping to protect employees and other site users.
Risk matrix key
| Likelihood | Severity |
|---|---|
| 1 Very unlikely | 1 Insignificant |
| 2 Unlikely | 2 Minor |
| 3 Possible | 3 Moderate |
| 4 Likely | 4 Major |
| 5 Very likely | 5 Catastrophic |
| Rating | Risk Level | Action Required |
|---|---|---|
| 1-4 | Low | Acceptable, manage by routine procedures |
| 5-9 | Medium | Adequate controls required, monitor and review |
| 10-15 | High | Significant controls required, senior management attention |
| 16-25 | Very High | Unacceptable, stop work, implement additional controls immediately |
Review
This risk assessment must be reviewed by 14 October 2027, or immediately if there is any significant change to the work, equipment, substances used, or location, or if an incident occurs.
Declaration and sign-off
I confirm that I have read and understood the requirements of this risk assessment. I will comply with the specified control measures. I confirm that these controls are in place and the required actions have been completed.
| Name | Role | Signature | Date |
|---|---|---|---|
| A. Supervisor | Supervisor | ||
| Operative 1 | |||
| Operative 2 | |||
| Operative 3 |
What a compliant Risk Assessment must contain
- Hazards specific to the actual task, site and materials
- Who might be harmed and how, for each hazard
- The controls already in place PLUS any further action needed
- A before/after risk score and a review date
Why a glazier's Risk Assessment gets rejected
- Copied from a generic example instead of written for the actual task
- Controls that don't match what the business actually does
- No record of who does the further actions, or by when
- An auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'
Already have one? Check it against the standard, free.
Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.
Glaziers hazards it must cover
Typical glazier work, meaning window and door replacement, curtain-wall and shopfront glazing, glass handling and installation, brings hazards a Risk Assessment has to address:
- manual handling of large glass units (cuts, crush, dropped loads)
- working at height on ladders, towers and MEWPs
- falls through openings during frame removal
- silica dust from cutting and grinding frames and reveals
- weather: wind loading on handled panes
Generate your Risk Assessment in minutes
Built to the correct published standard for a glazier: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your Risk AssessmentFAQ
Do glaziers legally need a Risk Assessment?
A standalone risk assessment following HSE's 5 steps: who might be harmed and how, and the controls that make the work safe. For glazier work, meaning window and door replacement, curtain-wall and shopfront glazing, glass handling and installation, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the 5-step method (INDG163).
What must a glazier's Risk Assessment contain?
At minimum: hazards specific to the actual task, site and materials; who might be harmed and how, for each hazard; the controls already in place PLUS any further action needed; A before/after risk score and a review date.
Why does a glazier's Risk Assessment get rejected?
The usual reasons: copied from a generic example instead of written for the actual task; controls that don't match what the business actually does; no record of who does the further actions, or by when; an auto-fail hazard (confined space, asbestos, live electrical) wrongly marked 'N/A'.
Which regulation is a glazier's Risk Assessment written under?
MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.
How fast can I get a Risk Assessment?
A couple of minutes. Describe the job, and RAMSReady writes a Risk Assessment for your exact glazier job live against the correct standard, with a review date and a sign-off/records section.
Not writing this one today?
We will email you a one page overview of what RAMSReady covers, so you have it when you need it.
Want to see how it would work for your firm?
Tell us roughly what you run and who keeps your records, and we will come back to you.