RAMS for Industrial Furnace & Heat Treatment Maintenance

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For furnace engineer work, it has to cover burns from hot surfaces and residual heat. It must include A hazard table with a likelihood × severity score before and after controls.

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a furnace engineer's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

A finished example

Example RAMS for a furnace engineer job

The job it was written for: “Job: servicing, repair and relining of industrial furnaces, ovens, kilns and heat-treatment plant. Commercial unit, occupied during working hours, 2 operatives, 1 day. Main risks: burns from hot surfaces and residual heat; confined-space entry into furnace chambers; refractory ceramic fibre and silica dust during relining.”. Names and contact details are anonymised.

EXAMPLE

Risk Assessment & Method Statement, Furnace Maintenance

Document Title: RAMS, Servicing, Repair & Relining of Industrial Furnaces
Company: Example Furnace Engineer Ltd
Author: A. Supervisor
Date: 14 October 2026
Version: V1.0
Review Date: 14 October 2027

Company details

FieldDetail
Company nameExample Furnace Engineer Ltd
Addressto be confirmed
Registration numberto be confirmed
Phoneto be confirmed
Named supervisorA. Supervisor
Insurance valid untilto be confirmed

Project / job information

FieldDetail
Site addressUnit 4, Example Trading Estate, Exeter EX2 8XX
ClientExample Client
Job start date14 October 2026
Job duration1 day
Number of operatives2
Emergency contactA. Supervisor, 01283 000000

Scope of works

The work involves the servicing, planned repair and relining of industrial furnaces, ovens, kilns and associated heat-treatment plant at the specified client site. The work will be undertaken by two competent operatives. This document covers the key risks associated with this activity, including but not limited to, electrical isolation, entry into confined spaces, exposure to residual heat and hazardous dusts (Refractory Ceramic Fibres and silica).

Hazard identification

This risk assessment is a 'suitable and sufficient' assessment of the risks to health and safety under the Management of Health and Safety at Work Regulations 1999, reg 3.

HAZARDRISK / WORST-CASE OUTCOMEWHO IS AT RISKRISK BEFORE CONTROLS: L × S = Score (Rating)CONTROL MEASURES (in hierarchy order, specific and measurable)RISK AFTER CONTROLS: L × S = Score (Rating)
Confined space entry (furnace chamber)Asphyxiation, toxic atmosphere, fire, explosion, heat stress, entrapment leading to serious injury or fatality.Operatives5 × 5 = 25 (Very High)A safe system of work for entry is a legal pre-condition under the Confined Spaces Regulations 1997.<br>1. Eliminate: Do not enter. Complete all possible work from outside.<br>2. Engineering: If entry is unavoidable, mechanically ventilate the space using forced-air ventilation before and during entry.<br>3. Admin: A Permit-to-Work system for confined space entry must be in place, signed off by the supervisor.<br>4. Atmosphere testing to be conducted by a competent person before entry and monitored during work (Oxygen, CO, CO2, LEL). Test results must be recorded on the permit. Entry only if O2 is 19.5%, 23.5%.<br>5. A top person/attendant must be present at the entry point at all times with dedicated rescue duties.<br>6. See separate Rescue Plan below.3 × 4 = 12 (High)
Electric shock / Arc flashElectrocution, serious burns, fatality.Operatives, client staff5 × 5 = 25 (Very High)Dead working is the default. Work on or near live conductors is prohibited unless it meets the strict criteria of the Electricity at Work Regulations 1989.<br>1. Isolate: Competent person to carry out safe isolation of all relevant circuits before work commences.<br>2. Lock: Apply a unique lock and safety tag to the isolation point. The person working on the circuit holds the only key.<br>3. Prove: Use a GS38-compliant voltage indicator and proving unit to prove the circuit is dead on all conductors. Prove the tester before and after use.<br>4. A permit-to-work system to be used for all electrical isolation.<br>5. Use insulated tools rated for the voltage.2 × 5 = 10 (High)
Contact with hot surfaces / residual heatSevere burns to skin.Operatives4 × 4 = 16 (Very High)1. Admin: Furnace must be confirmed as shut down and allowed to cool for a sufficient period before work commences. This is to be confirmed and recorded by the supervisor.<br>2. Use a digital thermometer to check surface temperatures before contact. Do not proceed if temperatures present a burn risk.<br>3. Wear thermal-resistant gloves (BS EN 407) and flame-retardant coveralls (BS EN ISO 11612).2 × 4 = 8 (Medium)
Inhalation of hazardous dust (Refractory Ceramic Fibres (RCF), Respirable Crystalline Silica (RCS))Lung cancer, silicosis, serious long-term respiratory disease.Operatives, client staff4 × 5 = 20 (Very High)1. Engineering: Use H-class vacuum cleaners for dust extraction at source during any cutting or breaking of refractory materials. Damp down materials with a fine water spray where practicable to suppress dust.<br>2. Admin: Segregate the work area with barriers and warning signs. Restrict access to authorised personnel only.<br>3. PPE: RPE is mandatory. Operatives must wear FFP3 disposable masks or a half-mask respirator with P3 filters, fit-tested to the individual. Ensure clean shaven policy for tight-fitting RPE.<br>4. See COSHH Assessment.2 × 5 = 10 (High)
Presence of asbestos (in pre-2000 plant, gaskets, insulation)Asbestosis, mesothelioma, lung cancer.Operatives4 × 5 = 20 (Very High)⛔ STOP, CONFIRM AT SITE SURVEY:<br>1. Check the site's asbestos register before starting work. Positively identify if Asbestos Containing Materials (ACMs) are present in the work area.<br>2. If no register exists, or its findings are unclear, assume asbestos is present until proven otherwise by sampling and analysis.<br>3. If ACMs are identified and are likely to be disturbed, all work must stop. A licensed asbestos contractor must be engaged as required under the Control of Asbestos Regulations 2012.2 × 5 = 10 (High)
Manual handling (refractory bricks, tools, equipment)Musculoskeletal injuries, strains, sprains, back injury.Operatives3 × 3 = 9 (Medium)1. Eliminate/Substitute: Use mechanical aids (trolleys, sack barrows) to move materials wherever possible.<br>2. Break down loads into smaller, more manageable weights.<br>3. Admin: Use two people for team lifts on awkward or heavy items. Ensure operatives are trained in correct kinetic lifting techniques.2 × 3 = 6 (Medium)
Slips, trips and fallsFractures, sprains, impact injuries.Operatives, client staff3 × 3 = 9 (Medium)1. Admin: Maintain good housekeeping throughout the work. Keep the work area clear of tools, materials and trailing leads.<br>2. Use 110V CTE supply for portable tools. Route cables away from walkways.<br>3. Clean up any spills immediately.<br>4. Ensure adequate lighting levels in the work area.2 × 2 = 4 (Low)

Method statement

This provides a step-by-step sequence for completing the work safely. All operatives must read and understand this method statement before work begins.

  1. Preparation and Site Arrival

    • Arrive at site, report to the client representative and sign in.
    • Conduct a pre-start site walk-through with the client to identify any site-specific hazards. Review the site asbestos register.
    • Establish a designated work area. Use barriers and warning signs to segregate the area from client staff and visitors.
    • Unload tools and equipment, storing them neatly within the designated area.
  2. Isolation and Proving Dead

    • The competent operative will identify all electrical, gas and other energy sources for the furnace.
    • A permit-to-work for isolation will be raised and signed by the supervisor.
    • The competent person will isolate all energy sources at the designated isolation points.
    • Each isolation point will be secured with a personal padlock and a "Danger: Do Not Operate" tag. The operative retains the only key.
    • Using a GS38-compliant voltage tester and proving unit, the operative will prove all electrical circuits are dead. The tester is to be proven functional immediately before and after the test.
  3. Furnace Cooldown and Initial Checks

    • Confirm with the client that the furnace has been shut down for the required cooling period.
    • Using a non-contact thermometer, check surface temperatures of the furnace shell and access points. Work will not proceed until temperatures are at a safe level (to be confirmed by supervisor).
  4. Confined Space Entry and Works (if required)

    • A confined space entry permit will be completed and signed by the supervisor.
    • Set up forced-air ventilation into the furnace chamber.
    • A competent person will test the atmosphere inside the chamber for oxygen levels, flammable gases and toxic contaminants. Results are recorded on the permit. Entry is only permitted if oxygen is between 19.5% and 23.5%.
    • The designated top person will take position at the entry point. A communications system (e.g., voice, radio) will be established between the entrant and top person.
    • Rescue equipment (tripod, winch, harness) must be in position and ready for immediate use. See Rescue Plan.
    • The operative, wearing required PPE including harness and RPE, will enter the furnace to carry out relining/repair work.
    • During relining, use an H-class vacuum at the point of work to capture dust. Damp down surfaces where possible.
  5. Servicing and Repair

    • Carry out inspection, servicing and replacement of components as per the job specification.
    • Use correct tools for the task. All power tools to be 110V and visually inspected for damage before use.
    • Bag all waste materials, particularly old RCF insulation, at the point of work. Double-bag RCF waste and label it clearly as hazardous.
  6. Reinstatement and Testing

    • On completion of works, remove all tools, equipment and waste from the furnace.
    • Visually inspect the work area to ensure it is clean and safe.
    • Account for all personnel and exit the confined space. The entry permit is signed off and closed.
    • The competent person will remove their locks and tags and re-energise the plant in accordance with the permit-to-work procedure.
    • Conduct functional tests of the furnace with the client representative present.
  7. Completion and Handover

    • Clear the work area of all tools, equipment and waste materials.
    • Ensure waste is disposed of in the correct site skips. RCF waste must be handled as hazardous waste according to site procedures.
    • Formally hand the equipment back to the client representative and complete any close-out paperwork.
    • Sign out at the site reception before leaving.

Hazardous substances used

A COSHH assessment must be completed for any hazardous substance used or created by the work, as required by the Control of Substances Hazardous to Health Regulations 2002.

SubstanceWhere usedHazardControlsCOSHH assessment ref.
Refractory Ceramic Fibre (RCF) dustCreated during reliningCarcinogenic, respiratory irritantWater suppression, H-class LEV, FFP3 RPE, segregationCOSHH-1 (generate)
Respirable Crystalline Silica (RCS) dustCreated during reliningSilicosis, lung cancerWater suppression, H-class LEV, FFP3 RPE, segregationCOSHH-2 (generate)

Competence and training

RoleRequired competence (cards, tickets, training)Evidence held
All operativesSite induction; Manual handling training; Asbestos awareness (UKATA Cat A)to be confirmed by Example Furnace Engineer Ltd
Lead Engineer18th Edition (BS 7671) qualification; ECS card; Safe isolation trainingto be confirmed by Example Furnace Engineer Ltd
Confined Space Entrant / Top PersonCity & Guilds Medium Risk Confined Space Entry (or equivalent)to be confirmed by Example Furnace Engineer Ltd
Named first aider (to be confirmed)First Aid at Work (FAW) certificate, in dateto be confirmed by Example Furnace Engineer Ltd

PPE requirements

All PPE must be inspected before use and replaced if damaged.

ItemStandard
Safety helmetBS EN 397
Safety boots (steel toe cap)BS EN ISO 20345
Safety glassesBS EN 166
Flame-retardant coverallsBS EN ISO 11612
Thermal gloves (for heat)BS EN 407
Cut-resistant glovesBS EN 388
RPE (FFP3 mask or half-mask with P3 filter)BS EN 149 / BS EN 140

Emergency arrangements

EmergencyProcedure
First AidNamed First Aider: to be confirmed. First Aid Kit Location: In company vehicle.
Nearest HospitalRoyal Devon and Exeter Hospital, Exeter. Confirm before start on site.
FireStop work. Raise alarm. Evacuate to the designated assembly point. Call 999. Do not tackle the fire unless trained to do so.
SpillageMinor spills to be contained and cleaned with kits from the vehicle. Major spills to be reported to the site manager immediately.
EvacuationFollow the site's emergency evacuation procedure. Proceed to the designated fire assembly point.

Rescue plan

A rescue plan is a legal requirement for confined space entry under the Confined Spaces Regulations 1997. The arrangements must be suitable and sufficient and in place before entry begins.

  • Rescue method: Non-entry rescue is the primary method.
  • Named rescuer role: Dedicated Top Person / Attendant.
  • Rescue equipment (kept at entry point): Tripod, fall arrest/retrieval winch, full body harness (BS EN 361), gas monitor, communication equipment.
  • Rescue procedure:
    1. If the entrant becomes unresponsive or calls for help, the Top Person will immediately attempt to retrieve them using the winch system without entering the space.
    2. The Top Person will simultaneously raise the alarm to the site manager and emergency services.
    3. Entry by the Top Person or other rescuers is forbidden unless they are part of a trained rescue team with appropriate breathing apparatus and a separate safe system of work.
  • Emergency services:
    • Call 999. State the site address: Unit 4, Example Trading Estate, Exeter EX2 8XX.
    • Inform the operator: "Industrial incident involving a confined space." Provide details of any suspected atmospheric hazards or injuries.
    • A designated person will meet the emergency services at the site entrance and direct them to the incident location.
  • Suspension trauma: A person suspended in a harness can rapidly suffer serious injury. Rescue must be immediate. If a casualty is retrieved suspended in a harness, inform the ambulance service of this fact.

Environmental considerations

  • All waste, especially RCF and other hazardous materials, must be segregated and disposed of in accordance with site procedures and the Environmental Protection Act 1990.
  • Work to minimise dust creation.
  • Use spill kits to contain any leaks from plant or equipment.

Risk matrix key & sign-off

Risk matrix key

LikelihoodSeverity
5Very likely5Catastrophic
4Likely4Major
3Possible3Moderate
2Unlikely2Minor
1Very unlikely1Insignificant
RatingAction
16-25 Very HighUnacceptable, stop work
10-15 HighSignificant controls required
5-9 MediumAdequate controls required
1-4 LowAcceptable, manage by routine procedures

Operative declaration & sign-off

I confirm that I have read and understood the contents of this Risk Assessment and Method Statement. I agree to comply with the specified control measures and safe systems of work. I will stop work if I believe the task cannot be completed safely.

NameRoleSignatureDate

Supervisor confirmation

I confirm that the required actions have been completed and the control measures are in place before work starts.

NameRoleSignatureDate
A. SupervisorSupervisor

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a furnace engineer's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited, such as CDM 2015 named for work that is not construction

Already have one? Check it against the standard, free.

Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.

Industrial Furnace & Heat Treatment Maintenance hazards it must cover

Typical furnace engineer work, meaning servicing, repair and relining of industrial furnaces, ovens, kilns and heat-treatment plant, brings hazards a RAMS has to address:

  • burns from hot surfaces and residual heat
  • confined-space entry into furnace chambers
  • refractory ceramic fibre and silica dust during relining
  • electrical isolation of heating elements and controls (stored energy)
  • gas, hydrogen and inert atmospheres (fire, explosion, asphyxiation)

Generate your RAMS in minutes

Built to the correct published standard for a furnace engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do industrial furnace & heat treatment maintenance legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For furnace engineer work, meaning servicing, repair and relining of industrial furnaces, ovens, kilns and heat-treatment plant, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What must a furnace engineer's RAMS contain?

At minimum: A hazard table with a likelihood × severity score before and after controls; controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last); A numbered, step-by-step method statement for the actual task; PPE to BS EN standards, emergency arrangements, and an operative sign-off.

Why does a furnace engineer's RAMS get rejected?

The usual reasons: residual risk dropped from high to low on PPE or 'competent operatives' alone; generic hazards that could apply to any job; no method statement, or one too vague to follow on site; the wrong legal basis cited, such as CDM 2015 named for work that is not construction.

Which regulation is a furnace engineer's RAMS written under?

MHSWR 1999. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/1999/3242/contents.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact furnace engineer job live against the correct standard, with a review date and a sign-off/records section.

Not writing this one today?

We will email you a one page overview of what RAMSReady covers, so you have it when you need it.

Want to see how it would work for your firm?

Tell us roughly what you run and who keeps your records, and we will come back to you.

Related guides

Other documents for Industrial Furnace & Heat Treatment Maintenance

Similar trades

Templates and tools