COSHH Assessment · Air Conditioning Engineers
COSHH Assessment for Air Conditioning Engineers
A COSHH assessment of the hazardous substances used or created, built from the product's Safety Data Sheet (COSHH 2002). For air conditioning engineer work, it has to cover refrigerant gases: toxic, asphyxiation and pressure release risks (F-Gas regulated). It must include each substance with its hazard statements and CAS number from the SDS.
A COSHH assessment of the hazardous substances used or created, built from the product's Safety Data Sheet (COSHH 2002). Below: what a air conditioning engineer's COSHH Assessment must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.
A finished example
Example COSHH Assessment from a similar trade (Electricians)
We do not have a finished COSHH Assessment for air conditioning engineers yet, so this one is from electricians: the layout, scoring and sign-off are what yours needs, but the hazards and method will be different for your job.
The job it was written for: “Substances used and created during installations, rewires, consumer-unit changes, testing and fault-finding. Commercial unit, occupied during working hours, 4 operatives, 2 days. Main risks: electric shock; working at height on steps and towers; asbestos in pre-2000 fabric.”. Names and contact details are anonymised.
COSHH Assessment, Example Electrician Ltd
| Document Title | COSHH Assessment |
|---|---|
| Company | Example Electrician Ltd |
| Site Address | Unit 4, Example Trading Estate, Exeter EX2 8XX |
| Work Activity | Installation, rewiring, consumer unit changes, testing and fault-finding. |
| Assessor | A. Supervisor |
| Assessment Date | 14 October 2026 |
| Version | V1.0 |
| Review Date | 14 October 2027 |
1. Substances Assessed
This assessment is based on representative products. The Safety Data Sheet (SDS) for each specific product used on site MUST be available and consulted.
| Product / Supplier Name (SDS §1) | Form | Hazard Classification & Key H-Statements (SDS §2) | Hazardous Ingredient(s) & CAS No. (SDS §3) | Workplace Exposure Limit (WEL) from EH40/2005 (SDS §8) |
|---|---|---|---|---|
| WD-40 Multi-Use Product | Liquid / Aerosol | Flam. Aerosol 1: H222 Extremely flammable aerosol. STOT SE 3: H336 May cause drowsiness or dizziness. H229 Pressurised container: May burst if heated. | Hydrocarbons, C9-C11, n-alkanes, isoalkanes, cyclics, < 2% aromatics (CAS: 64742-48-9) | Long-term (8 hr TWA): 1200 mg/m³ |
| Contact Cleaner / Switch Cleaner (e.g. Servisol Super 10) | Liquid / Aerosol | Flam. Aerosol 1: H222 Extremely flammable aerosol. Skin Irrit. 2: H315 Causes skin irritation. STOT SE 3: H336 May cause drowsiness or dizziness. Aquatic Chronic 2: H411 Toxic to aquatic life with long lasting effects. H229 Pressurised container: May burst if heated. | Naphtha (petroleum), hydrotreated light (CAS: 64742-49-0) | Long-term (8 hr TWA): 1200 mg/m³ |
| Cable Pulling Lubricant (e.g. Yellow 77) | Gel / Liquid | Generally classified as not hazardous. | Water based polymer lubricant. | No WEL assigned, control exposure to As Low As Reasonably Practicable (ALARP). |
2. Process-Generated Substances
| Substance | Process Creating Substance | Hazard Classification & Key Health Effects | Workplace Exposure Limit (WEL) from EH40/2005 |
|---|---|---|---|
| Respirable Crystalline Silica (RCS) | Drilling, cutting or chasing into concrete, brick, mortar, stone or other siliceous materials. | STOT RE 1: H372 Causes damage to lungs through prolonged or repeated exposure (Silicosis). Carc. 1A: H350 May cause cancer. | Long-term (8 hr TWA): 0.1 mg/m³ |
| General airborne dust (non-silica) | Drilling into plasterboard, wood, or other non-siliceous building materials. | May cause irritation to the respiratory system and eyes. | Long-term (8 hr TWA): 10 mg/m³ (inhalable dust); 4 mg/m³ (respirable dust). |
| Asbestos fibres (Presumed Present) | Any disturbance of pre-2000 building fabric where an Asbestos Refurbishment & Demolition Survey is not available or is inconclusive. | Carc. 1A: H350 May cause cancer. STOT RE 1: H372 Causes damage to lungs through prolonged or repeated exposure. H334 May cause allergy or asthma symptoms or breathing difficulties if inhaled. | Control Limit: 0.1 fibres/cm³ over a continuous 4-hour period. Short-term exposure limit: 0.6 fibres/cm³ over a 10-minute period. |
3. Who is Exposed and How?
| Group Exposed | Routes of Exposure | Frequency & Duration |
|---|---|---|
| Electrical Operatives (4) | Inhalation: Dusts from drilling (RCS), vapours from solvents, aerosol mists. Skin Contact/Absorption: Direct contact with solvents, lubricants. Splashes to eyes. Ingestion: Transfer from contaminated hands to mouth. | Intermittent use over two working days. Dust exposure is typically short but high intensity during drilling/chasing tasks. |
| Other Occupants in Unit 4 | Inhalation: Migration of dusts and solvent vapours from the immediate work area. | Potentially for the duration of the work if control measures are inadequate. |
| Maintenance / Cleaning Staff | Inhalation / Skin Contact: Contact with settled dust or spills left after work is completed. | Post-completion of works. |
4. Risk Evaluation
The principal health risks arise from the inhalation of process-generated dusts, particularly Respirable Crystalline Silica (RCS) from drilling into masonry, which can cause irreversible lung damage and cancer. The risk is high without effective controls.
Inhalation of solvent vapours from cleaners and lubricants can cause dizziness and respiratory irritation. The risk is medium in poorly ventilated areas.
Skin contact with solvents can cause dermatitis. The risk is low with good working practices.
⛔ Asbestos: Any work on pre-2000 buildings carries a high risk of disturbing asbestos containing materials (ACMs). Accidental release of asbestos fibres presents a severe, life-threatening risk. This risk must be managed before any intrusive work begins.
5. Control Measures (COSHH Regulation 7 Hierarchy)
The following control measures are required. The responsible person must confirm they are implemented and maintained.
a) Prevention, Elimination or Substitution
- Asbestos: Before any intrusive work, confirm the location and condition of any ACMs from the site's asbestos register and management plan, as required by the Control of Asbestos Regulations 2012. If no information is available, work must stop and a survey must be commissioned. Do not drill into any material suspected of being an ACM. All work on licensed ACMs is prohibited.
- Substitute solvent cleaners with non-hazardous, water-based alternatives where technically possible.
- Design cable routes to minimise the need for drilling into concrete or masonry. Use existing voids or surface-mounted trunking where feasible.
b) Engineering Controls (Control at Source)
- Dust Control: For all drilling, chasing or cutting into masonry, concrete or brick, use on-tool extraction (M-Class or H-Class vacuum extractor) connected directly to the power tool.
- Ventilation: Ensure good natural ventilation in the work area by opening windows and doors. For extensive solvent use in enclosed spaces, use mechanical ventilation.
c) Organisational / Administrative Controls
- Restrict access to the immediate work area to essential personnel only.
- Use screens or barriers to contain dust where practicable.
- Implement wet-suppression techniques for dust control where on-tool extraction is not feasible (e.g. damping down surfaces before and during work).
- Prohibit eating, drinking, and smoking in the work area.
- Provide designated hand-washing facilities with soap and water.
- Ensure operatives wash hands before breaks and after finishing work.
- Rotate tasks between operatives to reduce the duration of exposure for any single individual.
- Keep lids on all containers when not in use. Store aerosols and flammable liquids away from heat sources or sources of ignition.
d) Personal Protective Equipment (PPE) & Respiratory Protective Equipment (RPE)
PPE/RPE is the last line of defence and must be used in addition to the measures above, not as a replacement.
| Substance / Task | Required RPE / PPE (specify standard) |
|---|---|
| Drilling/cutting masonry (RCS) | RPE: FFP3 disposable mask or half-mask with P3 filter (BS EN 149). Must be face-fit tested for the individual wearer. PPE: Safety glasses (BS EN 166). |
| Using solvent cleaners / aerosols | PPE: Nitrile gloves (BS EN 374), Safety glasses (BS EN 166). RPE: Required only if ventilation is poor and WEL is likely to be exceeded. Use organic vapour cartridge respirator (e.g. A2P3). |
| General dust (non-silica) | RPE: FFP2 disposable mask (BS EN 149). PPE: Safety glasses (BS EN 166). |
| Handling cable lubricants | PPE: No specific requirement, but gloves may be worn for hygiene. |
6. Exposure vs Workplace Exposure Limit (WEL)
With the engineering and organisational controls specified above implemented correctly, exposure to all substances should be controlled to well below their respective Workplace Exposure Limits. For substances without a WEL, exposure will be reduced to As Low As Reasonably Practicable (ALARP). For carcinogens (RCS, Asbestos), control must always be ALARP, even if below the WEL or Control Limit.
7. First Aid Measures (from SDS §4)
| Route | First Aid Instructions |
|---|---|
| Inhalation | Move the person to fresh air and keep comfortable for breathing. If respiratory symptoms persist, seek medical attention. |
| Skin Contact | Remove contaminated clothing. Wash skin thoroughly with soap and water. If skin irritation or rash occurs, seek medical advice. |
| Eye Contact | Rinse cautiously with clean water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing. If eye irritation persists, seek medical attention. |
| Ingestion | Do NOT induce vomiting. Rinse mouth. Seek medical attention if you feel unwell. |
| Emergency Contact | A. Supervisor, 01283 000000 |
8. Spillage & Accidental Release Measures (from SDS §6)
- Small Spills (Solvents/Lubricants): Ventilate the area. Remove all sources of ignition. Absorb the spill with inert material (e.g., sand, granules) and collect into a suitable, labelled container for disposal.
- Accidental Release of Asbestos: Stop all work immediately. Evacuate the area and prevent re-entry. Report immediately to the site manager and supervisor. The area must be assessed and decontaminated by a licensed asbestos contractor.
9. Handling, Storage & Disposal
- Handling: Avoid contact with skin and eyes. Do not breathe vapours or dust.
- Storage: Store all chemical products in their original, clearly labelled containers in a cool, well-ventilated area away from heat, direct sunlight and sources of ignition.
- Disposal: All waste materials, including used containers, contaminated rags, and dust from vacuum cleaners, must be disposed of as controlled waste in accordance with local authority and Environment Agency requirements. Do not empty into drains.
10. Health Surveillance
Health surveillance under COSHH Regulation 11 is required for operatives with regular, ongoing exposure to Respirable Crystalline Silica. This includes periodic lung function tests. Records must be kept for 40 years.
11. Information, Instruction & Training
All operatives must be provided with:
- A copy of this assessment and relevant Safety Data Sheets.
- Information on the specific hazards and risks of the substances used.
- Instruction and training on the correct use of control measures, including on-tool extraction and RPE.
- Information on the signs and symptoms of exposure.
- Training on emergency procedures.
- Asbestos awareness training (UKATA or equivalent) is mandatory for any operative liable to disturb the building fabric.
12. Review
This assessment must be reviewed by the date specified in the header, or immediately if:
- There is a significant change in the work process or substances used.
- There is reason to suspect that control measures are no longer effective.
- An incident occurs related to substance exposure.
- New information on hazards becomes available.
Declaration and Sign-off
The responsible person confirms that the required actions have been completed, the control measures are in place, and the contents of this assessment have been communicated to all relevant personnel.
| Name | Role | Signature | Date |
|---|---|---|---|
| A. Supervisor | Supervisor | ||
| Operative 1 | |||
| Operative 2 | |||
| Operative 3 | |||
| Operative 4 |
What a compliant COSHH Assessment must contain
- Each substance with its hazard statements and CAS number from the SDS
- The Workplace Exposure Limit (EH40) where one exists, never invented
- Controls in order of effectiveness, LEV and ventilation before RPE (COSHH 2002)
- Process-generated substances screened (dust, fume, silica)
Why a air conditioning engineer's COSHH Assessment gets rejected
- Generic solvent boilerplate instead of the actual SDS hazards
- A Workplace Exposure Limit fabricated for a substance that has none
- Exposure risk credited mainly to gloves/masks (RPE is the LAST resort)
- Process dust/fume (wood dust, welding fume, RCS) not assessed
Already have one? Check it against the standard, free.
Paste it below and it is scored the way an inspector would, with the failings that would get it rejected. No sign-up.
Air Conditioning Engineers hazards it must cover
Typical air conditioning engineer work, meaning Install, commission, service and maintain air conditioning and refrigeration systems in commercial and residential buildings, including pipework, electrical connections and refrigerant handling., brings hazards a COSHH Assessment has to address:
- Refrigerant gases: toxic, asphyxiation and pressure release risks (F-Gas regulated)
- Electrical isolation: live conductors during installation and fault-finding
- Working at height: rooftop and ceiling-void mounted units
- Legionella risk in cooling towers and associated water systems
- Manual handling: heavy condensing units and air handling equipment
- Asbestos in pre-2000 building fabric disturbed during installation
Generate your COSHH Assessment in minutes
Built to the correct published standard for a air conditioning engineer: specific controls, the right legal basis, a review date and a sign-off section you can operate.
Start your COSHH AssessmentFAQ
Do air conditioning engineers legally need a COSHH Assessment?
A COSHH assessment of the hazardous substances used or created, built from the product's Safety Data Sheet (COSHH 2002). For air conditioning engineer work, meaning Install, commission, service and maintain air conditioning and refrigeration systems in commercial and residential buildings, including pipework, electrical connections and refrigerant handling., it is the document a client, principal contractor or inspector expects to see, grounded in COSHH 2002 reg 6/7 (HSE), built from the product Safety Data Sheet.
What must an air conditioning engineer's COSHH Assessment contain?
At minimum: each substance with its hazard statements and CAS number from the SDS; the Workplace Exposure Limit (EH40) where one exists, never invented; controls in order of effectiveness, LEV and ventilation before RPE (COSHH 2002); process-generated substances screened (dust, fume, silica).
Why does an air conditioning engineer's COSHH Assessment get rejected?
The usual reasons: generic solvent boilerplate instead of the actual SDS hazards; A Workplace Exposure Limit fabricated for a substance that has none; exposure risk credited mainly to gloves/masks (RPE is the LAST resort); process dust/fume (wood dust, welding fume, RCS) not assessed.
Which regulation is an air conditioning engineer's COSHH Assessment written under?
COSHH 2002. The full text is on legislation.gov.uk at https://www.legislation.gov.uk/uksi/2002/2677/contents.
How fast can I get a COSHH Assessment?
A couple of minutes. Describe the job, and RAMSReady writes a COSHH Assessment for your exact air conditioning engineer job live against the correct standard, with a review date and a sign-off/records section.
Not writing this one today?
We will email you a one page overview of what RAMSReady covers, so you have it when you need it.
Want to see how it would work for your firm?
Tell us roughly what you run and who keeps your records, and we will come back to you.