RAMS for Dryliners & Ceiling Fixers

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. Below: what a dryliner's RAMS must contain, why they get rejected, and the hazards it has to cover, or generate one for your exact job in a couple of minutes.

What a compliant RAMS must contain

  • A hazard table with a likelihood × severity score before and after controls
  • Controls in the correct hierarchy (eliminate → substitute → engineering → admin → PPE last)
  • A numbered, step-by-step method statement for the actual task
  • PPE to BS EN standards, emergency arrangements, and an operative sign-off

Why a dryliner's RAMS gets rejected

  • Residual risk dropped from high to low on PPE or 'competent operatives' alone
  • Generic hazards that could apply to any job
  • No method statement, or one too vague to follow on site
  • The wrong legal basis cited (e.g. 'CDM 2015 requires a RAMS')

Already have one? Check it against the standard, free.

Paste your RAMS into the free checker and it scores it the way an inspector would, and flags exactly what would get it rejected. No sign-up.

Check yours free

Dryliners & Ceiling Fixers hazards it must cover

Typical dryliner work, meaning metal-stud partitions, plasterboard, suspended ceilings and taping, brings hazards a RAMS has to address:

  • manual handling of full boards and repetitive overhead work
  • working at height from podiums, hop-ups and towers
  • plaster and gypsum dust
  • cuts from board knives and metal stud edges
  • noise from fixing tools

Generate your RAMS in minutes

Built to the correct published standard for a dryliner: specific controls, the right legal basis, a review date and a sign-off section you can operate.

Start your RAMS

FAQ

Do dryliners & ceiling fixers legally need a RAMS?

A combined Risk Assessment & Method Statement, the site-ready document a principal contractor or client asks for before you start. For dryliner work, meaning metal-stud partitions, plasterboard, suspended ceilings and taping, it is the document a client, principal contractor or inspector expects to see, grounded in MHSWR 1999 reg 3 (HSE): the combined risk assessment + method statement contractors submit.

What makes a dryliner's RAMS fail?

The usual reasons: Residual risk dropped from high to low on PPE or 'competent operatives' alone; Generic hazards that could apply to any job; No method statement, or one too vague to follow on site. RAMSReady generates one to the correct published form and avoids these.

How fast can I get a RAMS?

A couple of minutes. Describe the job, and RAMSReady writes a RAMS for your exact dryliner job live against the correct standard, with a review date and a sign-off/records section.